Loading...
HomeMy WebLinkAboutPlanRK . SET LENT -96.67 f f I TH �5 TH � I #4 ` r I < C� Q W tf *2 TH1 #1 r i BOTTOM SYS -E ELEV. = 496.8 FA 20' 0 20 40 SCALE. 1 "-20' �-' / e w e 27'-4" PVC (ASTM 1785) 1500 GALLON SEPTIC TANK INV. IN= 498.75 INV. OUT= 498.5 e h� 1 I TH #646 �. TH / #607/ l FILTER BARRIER INSTALLATION & MAINTENANCE 1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION. 2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE POST 1.5 FEET INTO THE GROUND. 3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING AND BACKFILL. 4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL. 4" TOPSOIL 5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS r NOT REGULATED BY THE INLAND WETLANDS COMMISSION. 6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY. I i an IL • r au 4" CLEAN FILL TEMPORARY VEGETATIVE COVER LOAM & SEED CROSS-SECTION DETAIL ------ - NOT TO SCALE A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS IT SHALL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND SEED IS APPLIED. 10--10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F. LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW FREE FROM WEEDS AND COARSE MATTER SHALL DE USED AT A RATE OF 70-90 LBS. PER 1000 S.F. AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS. 1 V-0" -0" I---- 8" TYP. 2 PLACES V a I PERMANENT VEGETATIVE COVER TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES. TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS. PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR 7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES. INSPECT SEEDBED BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL, RETILL COMPACTED AREAS. APPLY THE OUTLET FOLLOWING GRASS SEED MIX: 4" L. P. P.V.C. PIPE SEAL �- 4" L.P. P.V.C. PIPE SEAL SEED MIXTURE I.B.S./ACRE LBS. Z1000 S.F. TYP. 3 PLACES KENTUCKY BLUEGRASS 20 0.45 PLAN VIEW CREEPING RED FESCUE 20 0.45 PERENNIAL RYEGRASS 5 0.10 45 1.00 24"DIA. 24"DIA. COVER COVER _I f THE RECOMMENDED SEEDING DATES ARE: APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15 - FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW 18" 6" 20" IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABLISHED INLET BAFFLE 6" WALLS4FILTER ` _ 1 " OUTLET I A LIQUID I DEVICE 6" A LEVEL SELECT FILL SPECIFICATION ,; -- _•, _- _. SELECT FILL PLACED WITHIN AND ADJACENT TO LEACHING SYSTEM AREAS SHALL BE COMPRISED OF CLEAN SAND, OR SAND AND GRAVEL, FREE FROM ORGANIC GROSS SECTIOB VIEW MATTER AND FOREIGN SUBSTANCES. THE SELECT FILL SHALL MEET THE FOLLOWING REQUIREMENTS PER THE CONNECTICUT PUBLIC HEALTH CODE FOR USE WITHIN THE LEACHING AREA: 1,500 GALLON SEPTIC TANK 1. THE SELECT FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN THE NOT TO SCALE THREE (3) INCH SLEEVE. 2. UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED ON THE #4 SLEEVE (THIS IS THE GRAVEL PORTION OF THE SAMPLE). 3. THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHED AND THE SIEVE ANALYSIS STARTED, 4. THE REMAINING SAMPLE SHALL MEET THE FOLLOWIG CRITERIA: PERCENT PASSING SIEVE SIZE WET SIEVE DRY SIEVE #4 100 100 #10 70--100 70-100 #40 10-50* 10-75 6" SOIL COVER NON -WOVEN FILTER FABRIC #100 0-20 0-5 (MIN.) OVER STONE #200 0-5 0-2.5 * PERCENT PASSING THE #40 SIEVE CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE #100 SIEVE DOES NOT EXCEED 10% AND FINISH 4" PVC PERFORATED PLASTIC THE #200 SIEVE DOES NOT EXCEED 5%. GRADE DISTRIBUTION PIPE (ASTM D 3033) ONE NE OR CLEAN BROKENSCREENED GRAVEL TEST HOLE DATA ADDITIONAL TEST HOLE DATA 12" INVERT 6" 48" WIDTH FT 18" - - o MOTTLING LINE 12" x 48" LEACHING TRENCH NOT TO SCALE FILTER FABRIC 10' MAX, POST WIRE MESH FENCING 6" COMPACTED BACKFILL AFTER PLACEMENT OF' �>ILT FENCE SILT FENCE DETAIL NOT TO SCALE PER REFERENCE PLAN TH#60 0-4" TOPSOIL 4"-24" BROWN SANDY LOAM 24"-84" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 23" NO MOTTLING TH 606 0-4" TOPSOIL 4"-36" BROWN SANDY LOAM 36"-80" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 28" NO MOTTLING TN#607 0-3" TOPSOIL 3"-24" BROWN SANDY LOAM 24"-89" GREY SILTY SAND W/ROCKS NO LEDGE NO WATER NO MOTTLING T_ H;$ 0-3" TOPSOIL & ROCKS 3"-27" BROWN SANDY LOAM 27"-87" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 60" NO MOTTLING 1 . TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2. BASE FOR LEVELS: SUBDIVISION MAP. 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 9.11± ACRES 5. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 6. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4" SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE. 7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A CENTER TO CENTER SPACING OF 9 FEET. 8. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD--3034 AND SDR -35. 9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE PROPOSED SEPTIC SYSTEM. 11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION. 12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL. 144. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES. 15, ALL EXISTING UTIUTIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. 16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED. CALL BEFORE YOU DIG: 1-800-922-4455. AP REFERENCE SUBDIVISION PLAN, ALLISON'S WAY SUBDIVISION, PREPARED FOR RTT DEVELOPMENT, INC., CHAPEL HILL ROAD & FORSYTH ROAD, MONTVILLE, CT, PREPARED BY CME/CPK DESIGN GROUP, 110 BROADWAY, NORWICH, CT, DATED: 1/01/03, REVISED TO: 6/20/2003. r r� PERCOLATION RATE = 1-10 MIN./INCH 4 BEDROOM RESIDENCE REQUIRES 660 SF OF LEACHING AREA PROVIDE 2 - 110' LEACHING TRENCHES W/ENDS CONNECTED EFFECTIVE LEACHING AREA = 230 LF X 3.0 SF/LF = 690 SF PROVIDE 1,500 GAL. 2 -COMPARTMENT TANK M.L.S.S. REQUIRED 28 X 2.5 X 1.2 = 84 LF M.L.S.S. PROVIDED = 110 LF W 1:10:11 , 11 ,'�► 111 1 0 1. REMOVE AND STOCKPILE TOPSOIL, 2. PLACE BANK RUN GRAVEL IN 6" LIFTS AND PROVIDE OPTIMUM COMPACTION (95% DENSITY). 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5. CAP ENDS OF PIPES. 6. PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL. 7. REPLACE TOPSOIL, SEED & MULCH. 2.. _ RECORDED BY: UNCAS HEAC-'H DISTRICT i i i TH#4 0-5" TOPSOIL 0-5" TOPSOIL & ROCKS i0) 5"-45" BROWN SANDY LOAM FILTER BARRIER INSTALLATION & MAINTENANCE 1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION. 2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE POST 1.5 FEET INTO THE GROUND. 3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING AND BACKFILL. 4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL. 4" TOPSOIL 5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS r NOT REGULATED BY THE INLAND WETLANDS COMMISSION. 6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY. I i an IL • r au 4" CLEAN FILL TEMPORARY VEGETATIVE COVER LOAM & SEED CROSS-SECTION DETAIL ------ - NOT TO SCALE A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS IT SHALL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND SEED IS APPLIED. 10--10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F. LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW FREE FROM WEEDS AND COARSE MATTER SHALL DE USED AT A RATE OF 70-90 LBS. PER 1000 S.F. AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS. 1 V-0" -0" I---- 8" TYP. 2 PLACES V a I PERMANENT VEGETATIVE COVER TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES. TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS. PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR 7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES. INSPECT SEEDBED BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL, RETILL COMPACTED AREAS. APPLY THE OUTLET FOLLOWING GRASS SEED MIX: 4" L. P. P.V.C. PIPE SEAL �- 4" L.P. P.V.C. PIPE SEAL SEED MIXTURE I.B.S./ACRE LBS. Z1000 S.F. TYP. 3 PLACES KENTUCKY BLUEGRASS 20 0.45 PLAN VIEW CREEPING RED FESCUE 20 0.45 PERENNIAL RYEGRASS 5 0.10 45 1.00 24"DIA. 24"DIA. COVER COVER _I f THE RECOMMENDED SEEDING DATES ARE: APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15 - FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW 18" 6" 20" IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABLISHED INLET BAFFLE 6" WALLS4FILTER ` _ 1 " OUTLET I A LIQUID I DEVICE 6" A LEVEL SELECT FILL SPECIFICATION ,; -- _•, _- _. SELECT FILL PLACED WITHIN AND ADJACENT TO LEACHING SYSTEM AREAS SHALL BE COMPRISED OF CLEAN SAND, OR SAND AND GRAVEL, FREE FROM ORGANIC GROSS SECTIOB VIEW MATTER AND FOREIGN SUBSTANCES. THE SELECT FILL SHALL MEET THE FOLLOWING REQUIREMENTS PER THE CONNECTICUT PUBLIC HEALTH CODE FOR USE WITHIN THE LEACHING AREA: 1,500 GALLON SEPTIC TANK 1. THE SELECT FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN THE NOT TO SCALE THREE (3) INCH SLEEVE. 2. UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED ON THE #4 SLEEVE (THIS IS THE GRAVEL PORTION OF THE SAMPLE). 3. THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHED AND THE SIEVE ANALYSIS STARTED, 4. THE REMAINING SAMPLE SHALL MEET THE FOLLOWIG CRITERIA: PERCENT PASSING SIEVE SIZE WET SIEVE DRY SIEVE #4 100 100 #10 70--100 70-100 #40 10-50* 10-75 6" SOIL COVER NON -WOVEN FILTER FABRIC #100 0-20 0-5 (MIN.) OVER STONE #200 0-5 0-2.5 * PERCENT PASSING THE #40 SIEVE CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE #100 SIEVE DOES NOT EXCEED 10% AND FINISH 4" PVC PERFORATED PLASTIC THE #200 SIEVE DOES NOT EXCEED 5%. GRADE DISTRIBUTION PIPE (ASTM D 3033) ONE NE OR CLEAN BROKENSCREENED GRAVEL TEST HOLE DATA ADDITIONAL TEST HOLE DATA 12" INVERT 6" 48" WIDTH FT 18" - - o MOTTLING LINE 12" x 48" LEACHING TRENCH NOT TO SCALE FILTER FABRIC 10' MAX, POST WIRE MESH FENCING 6" COMPACTED BACKFILL AFTER PLACEMENT OF' �>ILT FENCE SILT FENCE DETAIL NOT TO SCALE PER REFERENCE PLAN TH#60 0-4" TOPSOIL 4"-24" BROWN SANDY LOAM 24"-84" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 23" NO MOTTLING TH 606 0-4" TOPSOIL 4"-36" BROWN SANDY LOAM 36"-80" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 28" NO MOTTLING TN#607 0-3" TOPSOIL 3"-24" BROWN SANDY LOAM 24"-89" GREY SILTY SAND W/ROCKS NO LEDGE NO WATER NO MOTTLING T_ H;$ 0-3" TOPSOIL & ROCKS 3"-27" BROWN SANDY LOAM 27"-87" GREY SILTY SAND W/ROCKS NO LEDGE WATER 0 60" NO MOTTLING 1 . TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2. BASE FOR LEVELS: SUBDIVISION MAP. 3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4. LOT AREA = 9.11± ACRES 5. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 6. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4" SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE. 7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A CENTER TO CENTER SPACING OF 9 FEET. 8. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD--3034 AND SDR -35. 9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE PROPOSED SEPTIC SYSTEM. 11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION. 12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL. 144. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES. 15, ALL EXISTING UTIUTIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. 16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED. CALL BEFORE YOU DIG: 1-800-922-4455. AP REFERENCE SUBDIVISION PLAN, ALLISON'S WAY SUBDIVISION, PREPARED FOR RTT DEVELOPMENT, INC., CHAPEL HILL ROAD & FORSYTH ROAD, MONTVILLE, CT, PREPARED BY CME/CPK DESIGN GROUP, 110 BROADWAY, NORWICH, CT, DATED: 1/01/03, REVISED TO: 6/20/2003. r r� PERCOLATION RATE = 1-10 MIN./INCH 4 BEDROOM RESIDENCE REQUIRES 660 SF OF LEACHING AREA PROVIDE 2 - 110' LEACHING TRENCHES W/ENDS CONNECTED EFFECTIVE LEACHING AREA = 230 LF X 3.0 SF/LF = 690 SF PROVIDE 1,500 GAL. 2 -COMPARTMENT TANK M.L.S.S. REQUIRED 28 X 2.5 X 1.2 = 84 LF M.L.S.S. PROVIDED = 110 LF W 1:10:11 , 11 ,'�► 111 1 0 1. REMOVE AND STOCKPILE TOPSOIL, 2. PLACE BANK RUN GRAVEL IN 6" LIFTS AND PROVIDE OPTIMUM COMPACTION (95% DENSITY). 3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5. CAP ENDS OF PIPES. 6. PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL. 7. REPLACE TOPSOIL, SEED & MULCH. 2.. _ RECORDED BY: UNCAS HEAC-'H DISTRICT DATE: 4-25-05 TH t TH#4 0-5" TOPSOIL 0-5" TOPSOIL & ROCKS 5"-48" BROWN SANDY LOAM 5"-45" BROWN SANDY LOAM 48"-86" GREY OLIVE BROWN ROCKY TILL 45-98" GREY OLIVE BROWN ROCKY TILL DEPTH 86" DEPTH 98" NO LEDGE NO LEDGE NO WATER NO WATER MOTTLING 0 48" MOTTLING 0 45" T. TH#2 0-5" TOPSOIL & ROCKS 0-7" TOPSOIL 5"-46" BROWN SANDY LOAM 7"-38" BROWN SANDY LOAM 46"-97" GREY OLIVE BROWN ROCKY TILL 38"-98" GREY OLIVE BROWN TILL DEPTH 97" DEPTH 98" NO LEDGE NO LEDGE NO WATER NO WATER MOTTLING 0 46" MOTTLING 0 38' TH 1HJ3 0-4" TOPSOIL & ROCKS 0-6" TOPSOIL 4"-40" BROWN SANDY LOAM 6"-45" BROWN SANDY LOAM 40"-94" GREY OLIVE BROWN ROCKY TILL 45"-75" GREY OLIVE BROWN, ROCKY TILL DEPTH 94" DEPTH 75" NO LEDGE NO LEDGE NO WATER NO WATER MOTTLING 0 40" MOTTLING 0 45" _ _ _ _ - PROPERTY LINE -- -- SETBACK UNE EXIST. CONTOURS EDGE OF ROAD EDGE OF DRIVEWAY PRIMARY SEPTIC SYSTEM RESERVE SEPTIC SYSTEM ------j54 i PROPOSED CONTOUR LINE PERCOLATION RATE INFORMATION PROVIDED PER REFERENCE PLAN PERCOLATION RATE: LOT #35/7-000 = 5.2 MIN/INCH CLA Engineers, Inc. CIVIL - STRUCTURAL - SURVEYING 5/24/05 REV. 4 BDRM. % UNCAS HEALTH COMMENTS 31'7 Main Street Norwich, CT 06360 No. DATE REVISION (860) 886-2966 Fax (860) 886-9165 Project. No. RTT Development, Inc. CIA -3186 Proj. Engineer ALLISON'S WAY SUBDIVISION J.F.M. #14 ALLISO'S WA`s Date: alas AAM. CT Sheet No. Septic Design - Lot #35/7- 000