HomeMy WebLinkAboutPlanFILTER BARRIER INSTALLATION &MAINTENANCE
1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION.
2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE
POST 1.5 FEET INTO THE GROUND.
3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING
AND BACKFILL.
4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL.
5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE
FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS
NOT REGULATED BY THE INLAND WETLANDS COMMISSION.
6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY.
TEMPORARY VEGETATIVE COVER
A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION
OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION
OPERATIONS IT SHALL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND
SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F.
LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A
RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW
FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F.
AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER
ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS.
N
FILTER FABRIC
BAN KRUN --�
GRAVEL
�- - 3" 3"--
2'- 10 "
12"
HIGH CAPACITY INFILTRATOR
NOT TO SCALE
11'-0"
8" TYP. 2 PLACES
00 i ► 1 1 /-T T/m T r'%1 A / , r-
0
PERMANENT VEGETATIVE COVER
TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE
GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES.
TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS
BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS FILTER FABRIC 10'
DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS. MAXIMUM POST
PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR WIRE MESH
7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES. INSPECT SEEDBED FENCING
BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL, RETILL COMPACTED AREAS. APPLY THE
FOLLOWING GRASS SEED MIX:
SEED MIXTURE LBS. ACRE Les./1000 S.F.
KENTUCKY BLUEGRASS 20 0.45
CREEPING RED FESCUE 20 0.45
PERENNIAL RYEGRASS 5 0.10 "
45 1.00
.�
THE RECOMMENDED SEEDING DATES ARE:
APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15
COMPACTED BACKFILL AFTER
FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW PLACEMENT OF SILT FENCE
IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABLISHED
SILT FENCE DETAIL
NOT TO SCALE
D -BOX #1 - REVERSED
INV. IN=544.67
INV. TO SYSTEM = 544.67
INV. TO D -BOX #2=544.84
INV. INTO I N FL ITRATO R = 544.42
BOTTOM INFLITRATOR=543.50
D- OX 2
INV. IN=54;
I NV. TO SY!
INV. INTO 11
BOTTOM INf
-v L.V. I .v.v. r It L .3LKL
TYP. 3 PLACES
PLAN VIEW
40' 0 40' 80'
SCALE: 1"=40'
l
TH#640A TH 639A
t
LOT; #43/�- 020 ,
f
TH"' 42A
l
TH#641A
--4-
24"DIA. 24"DIA.
6" COVER COVER
18" 6"
20"
INLET
BAFFLE
m - 6" WALLS 4' -1 "
I LIQUID j
UTLET ¢ LEVEL
"
L. P. P.V.C. 6"
IPE SEAL
1,500 GALLON SEPTIC TANK
NOT TO SCALE
or r g :0 r
wl oz f'03 ow
OUTLET
FILTER
DEVICE
SUBDIVISION PLAN, ALLISON'S WAY SUBDIVISION, PREPARED FOR RTT
DEVELOPMENT, INC., CHAPEL HILL ROAD & FORSYTH ROAD, MONTVILLE,
CT, PREPARED BY CME/CPK DESIGN GROUP, 110 BROADWAY, NORWICH,
CT, DATED: 1/01/03, REVISED TO: 6/20/2003.
TEST HOLE DATA
PER REFERENCE PLAN
TEST HOLE #642
0"-2" TOPSOIL & ROCKS
2"-33" BROWN SANDY LOAM
33"-110" COMPACT GRAY SILTY SAND W/ROCKS
NO LEDGE, WATER ® 101", NO MOTTLING
TEST HOLE .#643
0"-10" TOPSOIL & ROCKS
10"-37" BROWN SANDY LOAM
37"-101" WATER
NO LEDGE, WATER @ 21", NO MOTTLING
TEST HOLE #644
0"-3" TOPSOIL & ROCKS
3"-24" BROWN SANDY LOAM
24"-107" COMPACT GRAY SILTY SAND W/ROCKS
NO LEDGE, WATER ® 100", NO MOTTLING
TEST HOLE #645
0"-9" TOPSOIL & ROCKS
9"-20" BROWN SANDY LOAM
20"-101" WATER
NO LEDGE, WATER @ 20", NO MOTTLING
TEST HOLE 539A
0"-.-,q » I `nC)COIL =
1"-32" BROWN SANDY LOAM
32"-92" COMPACT GRAY SILTY SAND
NO LEDGE, WATER ® 52", MOTTLING CSA 36"
TEST HOLE #640A
0"-2" TOPSOIL
2"-27" BROWN SANDY LOAM
27"-93" COMPACT GRAY SILTY SAND
NO LEDGE, WATER @ 38", MOTTLING ® 27"
TEST HOLE #641A
0"-1 " TOPSOIL
1"-25" BROWN SANDY LOAM
25"-88" COMPACT GRAY SILTY SAND
NO LEDGE, WATER @ 70", NO MOTTLING
TEST HOLE #642A
0"-2" TOPSOIL
2"-28" BROWN SANDY LOAM
28"-106" COMPACT GRAY SILTY SAND
NO LEDGE, WATER 0 34", NO MOTTLING
PERCOLATION RATE
INFORMATION PROVIDED PER REFERENCE PLAN
PERCOLATION RATE: LOT #43/9-020= 8.3 MIN/INCH
DESIGN DATA
PERCOLATION RATE = 1.0-10 MIN./INCH
3 BEDROOM RESIDENCE REQUIRES 495 SF OF LEACHING AREA
PROVIDE 22 - 1'4"H x 2'10"W x 6'3"L HIGH CAPACITY INFILTRATOR SECTIONS
2 ROWS OF 11 SECTIONS AT 9' O.C.
EFFECTIVE LEACHING AREA = (22x6.25 LF) x 3.9 SF/LF = 536.3 SF
PROVIDE 1,500 GAL. 2 -COMPARTMENT TANK
M.L.S.S. REQUIRED = 34 x 1.5 x 1.2 = 61.2'
M.L.S.S. PROVIDED = 68.75'
PREPARE AREA OF PROPOSED SYSTEM AS FOLLOWS
1. REMOVE AND STOCKPILE TOPSOIL.
2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN
6" LIFTS AND COMPACTED TO 95% DENSITY.
3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS
PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE.
5. CAP ENDS OF PIPES.
6. PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF
THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL.
7. REPLACE TOPSOIL, SEED & MULCH.
GENERAL NOTES
1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING
STANDARDS.
2. BASE FOR LEVELS: SUBDIVISION MAP.
3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY
A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT.
4. LOT AREA = 2.96t ACRES
5. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE)
SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE
REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL
SYSTEM.
6. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4"
SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE.
7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A
CENTER TO CENTER SPACING OF 9 FEET.
8. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID
PVC CONFORMING TO ASTMD-3034 AND SDR -35.
9. FOUNDATION DRAIN PIPE FROM HOUSE TO CATCH BASIN SHALL CONFORM
TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS
AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL
SYSTEM.
10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE
PROPOSED SEPTIC SYSTEM.
11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE
PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION.
12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE
TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED
FOR FUTURE USE.
13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS,
CONSTRUCTION DEBRIS AND TOPSOIL.
14. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED
AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES.
15. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION.
16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED.
CALL BEFORE YOU DIG: 1-800-922-4455.
6" CRUSHED GRAVEL -
(COMPACTED)
HOT BITUMINOUS PAVEMENT
1" WEARING COURSE
2" RA' -';FC OHIRSF
___ 12" GRAVEL J
(COMPACTED)
BITUMINOUS DRIVE
NOT TO SCALE
4" TOPSOIL
a;.
0
4" LOAM
AND SEED
FILL ---/6' CLEAN FILL ---/
& _SEED CROSS-SECTION DETAIL
NOT TO SCALE
11111:1V
i
480
PROPERTY LINE
SETBACK LI N E
EXIST. CONTOURS
EDGE OF ROAD
EDGE OF DRIVEWAY
PRIMARY SEPTIC SYSTEM
RESERVE SEPTIC SYSTEM
PROPOSED CONTOUR LINE
CLA Engineers,Inc.
CIVIL • STRUCTURAL - SURVEYING
317 Main Street Norwich, Connecticut
No. Date Revision (860) 886-1966 Fax (860) 886-9165
Project No.
RTT Development, Inc. CIA -3186
Proj. Engineer
ALLISON'S WAY SUBDIVISION DateI.M.S.
MONTVILLE, CT 11/5/03
Sheet No.
Septic Design - Lot #43/9-020
61UA!5 J 6:011