INLET
BAFFLE
rn
I
4" L.P. P.V.C. PIPE SEAL
TYP. 3 PLACES
PLAN VIEW
1500 GALLON SEPTIC TANK
NOT TO SCALE
i
lei
BQ OM SYSTEM I
/ ELEV.= 540.6
i
4" L.P. P.V.C.
PIPE SEAL
6" SOIL COVER NON -WOVEN FILTER FABRIC
(MIN.) ---\ /_ OVER STONE
_ 4" PVC PERFORATED PLASTIC
DISTRIBUTION PIPE (ASTM D 3033)
ONE INCH CLEAN BROKEN
STONE OR SCREENED GRAVEL
INVERT
6"
_T
v MOTTLING
UNE
A ew I r• w r►1_N1^ 011`PfCk1^"
NOT TO SCALE
4" CLEAN FILL
LOAM & SEED CROSS-SECTION DETAIL
NOT TO SCALE
I i I I
I t
I I I
It I I t
I Q
P I P I
I I I I I I
I I I I I
t ► P I
u
I � I
( I W I 112' 30'-4-F
tr
I I I I I
ICV
�
t I 1 t
I I i l
i I I
TH t P J%12I t t
PROVIbE CONTINUOUS LINE
OF HA S OR SILT FENCE I 1 I I P I o
THROU� OUT CONSTRUCTION I I
P I t t
:I
P
L-
f
1
�P.00,
lb
1
�J
i
i
i
i
i
PROPOS
BITUMINOU -
DRNEWA
0-3' TOPSOIL
4"-25" BROWN SANDY LOAM
2x2 5/8 16 GA.
25"-53" GREY MED COMP SAND
/
53"-92" OLIVE BROWN SILTY SAND
WIRE MESH
4" PVC ELBOW
NO LEDGE
NO LEDGE
1-1 /2'
In
lei
BQ OM SYSTEM I
/ ELEV.= 540.6
i
4" L.P. P.V.C.
PIPE SEAL
6" SOIL COVER NON -WOVEN FILTER FABRIC
(MIN.) ---\ /_ OVER STONE
_ 4" PVC PERFORATED PLASTIC
DISTRIBUTION PIPE (ASTM D 3033)
ONE INCH CLEAN BROKEN
STONE OR SCREENED GRAVEL
INVERT
6"
_T
v MOTTLING
UNE
A ew I r• w r►1_N1^ 011`PfCk1^"
NOT TO SCALE
4" CLEAN FILL
LOAM & SEED CROSS-SECTION DETAIL
NOT TO SCALE
I i I I
I t
I I I
It I I t
I Q
P I P I
I I I I I I
I I I I I
t ► P I
u
I � I
( I W I 112' 30'-4-F
tr
I I I I I
ICV
�
t I 1 t
I I i l
i I I
TH t P J%12I t t
PROVIbE CONTINUOUS LINE
OF HA S OR SILT FENCE I 1 I I P I o
THROU� OUT CONSTRUCTION I I
P I t t
:I
P
L-
f
1
�P.00,
lb
1
�J
i
i
i
i
i
PROPOS
BITUMINOU -
DRNEWA
i
i py
GARAGE
"PVC PORCH _ SL1B=545.6
__
B ♦� /i
l I \
JSTM 1755)
PROPPSEq 4 BEDROOM i PROPOSED
RESIDENCE WELL LOGTION r �
F. F. 546.9 �
`PORCH
FILTER BARRIER INSTALLATION & MAINTENANCE
I. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION.
2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE
POST 1.5 FEET INTO THE GROUND.
3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING
AND BACKFILL
4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL
5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE
FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS
NOT REGULATED BY THE INLAND WETLANDS COMMISSION.
6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE "WEEKLY.
mh
-,:* 0, 1 IN Wl Z �1
A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION
OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMRWTED BY CONSTRUCTION
OPERATIONS IT SFWLL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTUZER, LIME AND
SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F.
LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A
RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW
FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F.
AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER
ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS.
TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE
GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES.
TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS
BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS
DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS.
PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR
7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTF? OF 4 INCHES. INSPECT SEEDBED
BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL. RET1U. COMPACTED AREAS. APPLY THE
FOLLOWING GRASS SEED MIX:
-SEED MARE 1a,/Am LBS./1000 S.F.
KENTUCKY BLUEGRASS 2X) 0.45
CREEPING RED FESCUE 20 0.45
PERENNIAL RYEGRASS 5 0.10
45 1.00
THE RECOMMENDED SEEDING DATES ARE:
APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15
FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW
IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATTVI; STAND CANNOT BE ESTABUSHED
20' 0 20' W.
SCALE: 1 "=20'
No. I DATE
GENERAL NOTES •
1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING
STANDARDS.
2. BASE FOR LEVELS: SUBDIVISION MAP.
3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY
A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT.
4. LOT AREA - 5.90f ACRES
5. ALL WORK AND MATERIAL (SEPTIC TANK. DISTRIBUTION BOX, PIPE),
SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE
REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL
SYSTEM.
6. SEWER UNE FROM FOUNDATION WALL TO SEPTIC SHALL. BE 4"
SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE.
7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A
CENTER TO CENTER SPACING OF 9 FEET.
8. PIPE FROM SEPTIC TANK TO DISTRIBUTION UNES SHALL BE 4" SOLID
PVC CONFORMING TO ASTUD-3034 AND SDR -35.
9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM
TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS
AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE: DISPOSAL
SYSTEM.
10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE
PROPOSED SEPTIC SYSTEM.
11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OFTHE
PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION.
12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE
TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED
FOR FUTURE USE.
13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STAMPS, ORGANICS,
CONSTRUCTION DEBRIS AND TOPSOIL
14. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED
AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES.
15. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION.
16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED.
CALL BEFORE YOU DIG: 1-800-922-4455.
17. ADDITIONAL TEST HOLES TO BE PROVIDED IN THE PRIMARY AND RESERVE AREAS.
►/ l ■ :4a ■ z -
SUBDIVISION PLAN, AWSON'S WAY SUBDIVISION, PREPARED FOR RTT
DEVELOPMENT, INC., CHAPEL HILL ROAD & FORSYTH ROAD, MONTVIL.LE.
CT, PREPARED BY CME/CPK DESIGN GROUP, 110 BROADWAY, NORWICH,
CT. DATED: 1/01/03, REVISED TO: 6/20/2003.
TEST HOLE DATA
PER REFERENCE PLAN
0-4" TOPSOIL
0-3' TOPSOIL
4"-25" BROWN SANDY LOAM
2x2 5/8 16 GA.
25"-53" GREY MED COMP SAND
/
53"-92" OLIVE BROWN SILTY SAND
WIRE MESH
4" PVC ELBOW
NO LEDGE
NO LEDGE
1-1 /2'
In
WATER 0 75"
NO MOTTLING
MOTTLING A 53"
1-1/4-
-1/4"
I
TH#610
0-3" TOPSOIL
1-3/4"
0-4" TOPSOIL
23"-37" GREY MED COMP SAND
4"-38' BROWN SANDY LOAM
37"-92' OLIVE BROWN SILTY SAND
38"-85" GREY MED COMP MED SAND
NO LEDGE
NO LEDGE
WATER 0 71 "
NO WATER
NO MOTTLING
ao
2"
2
PROVID�
ANTI -TRACKING PAD
STANDARD D -BOX W/ELBOW
} '
NOT TO SCALE
I
FILTER FABRIC of, IAIUM POST
>_
\
WIRE MESH
FENCING
1
4
J
C�
�
�6w
/
COMPACTED BACKFILL AFTER
}
PLACEMENT OF SILT FENCE
SILT FENCE DETAIL
NOT TO SCALE
i
i py
GARAGE
"PVC PORCH _ SL1B=545.6
__
B ♦� /i
l I \
JSTM 1755)
PROPPSEq 4 BEDROOM i PROPOSED
RESIDENCE WELL LOGTION r �
F. F. 546.9 �
`PORCH
FILTER BARRIER INSTALLATION & MAINTENANCE
I. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION.
2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE
POST 1.5 FEET INTO THE GROUND.
3. LAY THE BOTTOM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING
AND BACKFILL
4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL
5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OF ONE
FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS
NOT REGULATED BY THE INLAND WETLANDS COMMISSION.
6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE "WEEKLY.
mh
-,:* 0, 1 IN Wl Z �1
A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION
OF STOCKPILES. IF THE SOIL IN THE STOCKPILES HAS BEEN COMRWTED BY CONSTRUCTION
OPERATIONS IT SFWLL BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTUZER, LIME AND
SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS PER 1000 S.F.
LIMESTONE AT A RATE OF 90 LBS. PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A
RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW
FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F.
AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER
ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS.
TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE
GRADED TO A SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES.
TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS
BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS
DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS.
PER 1000 S.F. APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER ACRE OR
7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTF? OF 4 INCHES. INSPECT SEEDBED
BEFORE SEEDING. IF TRAFFIC HAS COMPACTED THE SOIL. RET1U. COMPACTED AREAS. APPLY THE
FOLLOWING GRASS SEED MIX:
-SEED MARE 1a,/Am LBS./1000 S.F.
KENTUCKY BLUEGRASS 2X) 0.45
CREEPING RED FESCUE 20 0.45
PERENNIAL RYEGRASS 5 0.10
45 1.00
THE RECOMMENDED SEEDING DATES ARE:
APRIL 1 - JUNE 15 AND AUGUST 1 - SEPTEMBER 15
FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH WITH WEED FREE STRAW
IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATTVI; STAND CANNOT BE ESTABUSHED
20' 0 20' W.
SCALE: 1 "=20'
No. I DATE
GENERAL NOTES •
1. TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING
STANDARDS.
2. BASE FOR LEVELS: SUBDIVISION MAP.
3. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY
A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT.
4. LOT AREA - 5.90f ACRES
5. ALL WORK AND MATERIAL (SEPTIC TANK. DISTRIBUTION BOX, PIPE),
SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE
REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL
SYSTEM.
6. SEWER UNE FROM FOUNDATION WALL TO SEPTIC SHALL. BE 4"
SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE.
7. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A
CENTER TO CENTER SPACING OF 9 FEET.
8. PIPE FROM SEPTIC TANK TO DISTRIBUTION UNES SHALL BE 4" SOLID
PVC CONFORMING TO ASTUD-3034 AND SDR -35.
9. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM
TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS
AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE: DISPOSAL
SYSTEM.
10. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE
PROPOSED SEPTIC SYSTEM.
11. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OFTHE
PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION.
12. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE
TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED
FOR FUTURE USE.
13. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STAMPS, ORGANICS,
CONSTRUCTION DEBRIS AND TOPSOIL
14. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED
AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES.
15. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION.
16. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED.
CALL BEFORE YOU DIG: 1-800-922-4455.
17. ADDITIONAL TEST HOLES TO BE PROVIDED IN THE PRIMARY AND RESERVE AREAS.
►/ l ■ :4a ■ z -
SUBDIVISION PLAN, AWSON'S WAY SUBDIVISION, PREPARED FOR RTT
DEVELOPMENT, INC., CHAPEL HILL ROAD & FORSYTH ROAD, MONTVIL.LE.
CT, PREPARED BY CME/CPK DESIGN GROUP, 110 BROADWAY, NORWICH,
CT. DATED: 1/01/03, REVISED TO: 6/20/2003.
TEST HOLE DATA
PER REFERENCE PLAN
0-4" TOPSOIL
0-3' TOPSOIL
4"-25" BROWN SANDY LOAM
3"-31 " BROWN SANDY LOAM
25"-53" GREY MED COMP SAND
31'-84" GREY MED COMP MED SAND
53"-92" OLIVE BROWN SILTY SAND
NO LEDGE
NO LEDGE
NO WATER
WATER 0 75"
NO MOTTLING
MOTTLING A 53"
THj612
TH#610
0-3" TOPSOIL
3"-23" BROWN SANDY LOAM
0-4" TOPSOIL
23"-37" GREY MED COMP SAND
4"-38' BROWN SANDY LOAM
37"-92' OLIVE BROWN SILTY SAND
38"-85" GREY MED COMP MED SAND
NO LEDGE
NO LEDGE
WATER 0 71 "
NO WATER
NO MOTTLING
POSSIBLE MOTTLING O 35"
PERCOLATION RATE
INFORMATION PROVIDED PER REFERENCE PLAN
PERCOLATION RATE: LOT #35/8-000 - 7.0 MIN/INCH
DESIGN DATA
PERCOLATION RATE - 1-10 MIN./INCH
4 BEDROOM RESIDENCE REQUIRES 660 SF OF LEACHING AREA
PROVIDE 2 - 110' LEACHING TRENCHES
EFFECTIVE LEACHING AREA - 220 LF X 3.0 SF/LF - 660 SF
PROVIDE 1.500 GAL 2 -COMPARTMENT TANK
M.L.S.S. 26 X 2 X 1.2 = 67.4 LF
M.LS.S. PROVIDED - 100 LF
�11
1. REMOVE AND STOCKPILE TOPSOIL
2. PLACE BANK RUN GRAVEL. LESS THAN 5% FINES) PLACED IN
6" UFTS AND COMPACTED TO 95% DENSITY.
3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS
PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE
5. CAP ENDS OF PIPES.
6. PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF
THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL.
7. REPLACE TOPSOIL.. SEED do MULCH.
- - PROPERTY UNE
g
SETBACK UNE
- - - - 544 - - - - EXIST. CONTOURS
EDGE OF ROAD
EDGE OF DRIVEWAY
® PRIMARY SEPTIC SYSTEM
o e J RESERVE SEPTIC SYSTEM
044 PROPOSED CONTOUR UNE
CLA Engin L, serInc.
CIVIL STRUCTURAL - SNG
317 Main Street Norwich, CT 06360
REVISION/- v (860) 886---1966 Fax (860) 886-0165
Project No.
Joe & Tracy Solesky CU -3599
Proj. Engineer
ALLISON'S WAY SUBDIVISION J.F.M.
#6 ALLISON'S INA` Date:/22/05
MO LES CT Sheet No.
Septic Design - Lot *35/8-000