STATEMENT OF SPECIAL 'IVcPEcTIGNS
ProJett: Uncesvilie CT
Location: 71 MOHley Road,Uncasville„t1•063s1 £ aae:A �.,,,,, L..
Owner SBA Communications
D5S1 ii riniaaainnai 1n ROCp617�lblC Cherpe.
Uimr.i+ri A.h.�L e-d r.:...-.....y, ... .
This Statitnrtnt df Skoal inspections is submitted as a condition for permit issuance In accordance with the
Special inspection and Structural Testing requirements of the Connecticut State 8uildIng.Code. it Includes a
schedule of Special Inspection services applicable to this project as well as the name of the Special Inspection
Coordinator and the identity of other approved agencies to bo retained For conducting these inspections and
tests. This St3tentent of Special.inspections encornpasses the following?disciplines:
0 Architectural El Structural
0 Mechanical 0 Electrical
O Plumbing D Fire Protection
0 Entire Project IZI Other: Special Cases _
The Special Inspection Coordinator shall keep records of all inspections and shall furnish inspection reports to the
Building Official and the Registered Design Professional in Responsible.Charge, Discoverer!discrepancies shall
brought to the it+'tmediate attention of the Contractor for correction. If such diScrepancles are not corrected the
discrepancies shall be brought to the attention of the Building Official and the Registered
Responsible Charge, The Special Inspection program does not relieveforof hisDesign Professional I.
the Contractor of his or her responsibilities.
Interim reports shall be submitted to the Building Official and the Registered Design Professional in Responsible
Charge. p
•
A Final Relbdrt of Special inspections documenting completion of all required.Special Inspections, testing an
correctioh bf any discrepancies noted in the inspections shall be submitted prior to issuance of a Certlflca a of
Use and Occupancy,
Job site safety and means and method;of construction are solely the responsibility of the Contractor.
• Interim Report Frequency, Upon Project Completion
or C]per attached schedule
Prepared by:
651tiliLairtrr,,,.
Carlo F.CentorePE(CT.pEit1ta694j ' ��lj
(type or rl t
Pip 8 'name] '1 h,.p. `•k ,- G� .
F 1� �5±i r
q r ?"t
f
Sign �urc+ f 3/14/16 ..� `"�� +C ,`
is,./ 1 r�r. date '',„Yl IL,IAjy NO
(Design Professional Seal)
Ri ilriina r-,n r,i„L nf.aiPler.�ti•;
r F y,,
-,7 (----,,,,
Y�r.!""w� G 1 ).)./..•''..
r
Date
CASE rnrn- zoi-rico Lcirwnt of SrmCiru Inanne‘rinr.p.4-`.C.A6C PPO-i