HomeMy WebLinkAbout10x16 Sunroom 2010 310 Norwich-New London TP ke.
Uncasville,CT 06382 Montville Building
860-848-3030,Ext 382
860-848-7231 Department
Fax
To: Michael Kane From: Carmen Kneeland
Fax: 860-793-6909 Pages: 2
Phone: Date: 08/19/10
Re: 19 Rainbow Drive cc:
0 Urgent 0 For Review 0 Please Comment 0 Please Reply 0 Please Recycle
TOWN OF MONTVILLE
Building Department
310 NORWICH-NEW LONDON TURNPIKE
UNCASVILLE, CT 06382-2599
TEL. (860) 848-3030 X382 FAX. (860) 848-7231
BUILDING PERMIT
Permit Number: B2010-0021 Date: 28-Jan-10 Map/Lot: 016/029-T19 Owner ID: 5755000
Project Location: 19 RAINBOW DRIVE Unit:
Job Description: Three Season Sunroom on Existing Deck
Owner Name: Paul T. Handleman and Philip Handleman Tenant Name: N/A
Careof:
19 Rainbow Drive
Uncasville CT 06382- Telephone: (860)204-1509
Contractor Name: Robert Sisk Telephone: (860)662-0020
DBA: Sisk Building &Remodeling Inc. Lic/Reg Type: HIC
Lic/Reg No: 554683
6 Carter Hill Road Exp Date: 30-Nov-10
Clinton CT 06413-
Construction Value Permit Fees Construction Information
Building Value: $6,500.00 Building Fee: $56.00 Use Group: IRC
Plumbing Value: $0.00 Plumbing Fee: $0.00 Code: 2005 State Building Code
Mechanical Value: $0.00 Mechanical Fee: $0.00
Electrical Value: $0.00 Electrical Fee: $0.00 Construction Type: IRC
Total Value: $6,500.00 Penalty Fee: $0.00 Permit Code: R4
C of 0 Fee: $0.00 Comments:
Plan Review Fee: $0.00
State Ed Fee: $1.43
Total Fee Paid: $57.43
It shall be the owners repsonsibility to schedule the following inspections a minimum of 2 business days in advance:
Field set of approved construction documents shall be available onsite during all inspections.
BUILDING PERMIT INSPECTIONS PLUMBING,MECHANICAL, ELECTRICAL PERMIT INSPECTIONS
❑ Footing-Prior to pouring concrete ❑ R Plumbing and leak test
❑ Deck Piers ❑ R Electrical
❑ Backfill - Footing drains and waterproofing ❑ Elec Trench-with conduit installed
❑ Concrete Slab- Prior to pouring concrete ❑ Pool Bonding
❑ Anchor Bolts-with sill plate and prior to floor framing ❑ Electrical Service CRS No: 0
❑ Framing ❑ R HVAC
❑ Masonry Fireplace Throat or Chimney Thimble ❑ Gas Piping and leak test
❑ Fireblocking Draftstopping INSPECTION REQUIRED UPON COMPLETION
❑ Insulation Ein -rt - of As s oval
Building Official's Approval: .f Occupancy�, �� -
01/19/2010 11:42 FAX 8606698594 S EA 002
ROM : FAX NO.
:an. 20 2010 12:01PM P1
Town of Montville
Maims Poosemant
310 NoryMch-NSW London Tpke.
Tei. 880-848-3030, Ext 382 Uncesvttie,CT 06382 Fa c. :':0-848-7231
RESIDENTIAL PERMIT APPLICATION FORM Penni;t NtaL:f2221a,
cny Tv
Naw Comb s ion �1 11 aumplan pf e Family guile
❑Addition ❑Two-Famii
13Alteration ElTownhouse iur. ahinlCel
Aooeeoery structure fntrlecirinal CRS*;
Property Address: 4 / T "c /-11&4-L-) %i)
(Number) (Street)
Job DesOr on: 7 /I 3 rlQvr-c. ii ,�S�I�J� / Gy�/tS(io 'X I�' ove✓-
'-/ Grrt1 on ,Y exISfi%h • /dy 4 •/�!! .
Owner: % v / h • -
L4,2,, ,o„1;4.
Gay: rMyi 11 e_ tom --
: �-+ Zip Code: dTelephene( fid) 04 - /Si3'
AppJIC 61 1 G-
OSA: - L. /, j 1 / ,N - �.r
Addreee: .J //
City: t":4)72 1V7 - State: zip Telephone(� 0), 6.6J C 2')
Contractors-Complete the Following:
Uaenee Type:/ 7 d —",�2 ) License No.=T, '- Expiration rete: /f ,fid/2a/0
nere loede that the armor Jaiproposed Woth.ark Weh.NI aanform to the>State BWkting Cade and art other coda('ea adopted by the state of Connecticut and the Town
�/ ad tarotlr h sufiWfted magazoimairogla _by Hao osw3ar lee � A. l�. iori to melte ra A
Irl 3y dieoldng Ada box,1 will follow the requirements of the 2 NEC as the alternative ccrepPehoe per section E3301.2.1 of the Reedentiel Code,
iateed of the ebatrical requirements In ct aptero 33 through 42 of the Residential Cods.
Owner/Agent Signature: Date: ///J//t5
Corts irtIcOm Pat ./
Bllhfing Whet _4/ d O. 410 ,G7
atikdtng F.
Plumbing View*: 0 Plumbinp Free:
!escheated Valu.: h Mechentoet Few
Eletdrioat Value: _ Eleotrical Fee: — -
TvW Value; 5 ,6 —o , rsu
/ — a -- Penetty Few_
Ce 0Few
5-1/00. U t fh G-te /41 I dkief/ Plan Revlew Fee:
State Ed Fee:
Toot Fee:
Qr++imEfMgru 23,war
Town of Montville
Building Department
File Receipt
Date: 01-Feb-10
Receipt No: 5191
Received From: Robert Sisk
Job Address: 19 Rainbow Drive
Fees Collected State Educational Training Fee
Cash: $0.00 Cash: $0.00
Check: $57.43 Check: $1.43
Check No: 5603
Short/Over: $0.00
Construction Value: $6,500.00
Demolition Value: $0.00
Received By Carmen Kneeland
Town of Montville
Building Department
Customer Receipt
Date: 01-Feb-10 Receipt No: 5191
Received From: Robert Sisk
Job Address: 19 Rainbow Drive
Fees Collected
Cash: $0.00
Check: $57.43
Check No: 5603
Received By Carmen Kneeland
Town of Montville
Building Department
File Receipt
Date: 25-Jan-10
Receipt No: 5182
Received From: Robert Sisk
Job Address: 19 Rainbow Drive
Fees Collected State Educational Training Fee
Cash: $0.00 Cash: $0.00
_______
Check: $57.43 Check:
Check No: $1.43
5603
Short/Over: $0.00
Construction Value: $6,500.00
Demolition Value: $000
Received By Carmen Kneeland CEA nitjuyv N't, -V--4,CdaliaL
.11111011111•111W
Address: 19 Rainbow Dr.
ITEM QTY $/UNIT TOTAL
Building Plumbing Mechanical Electrical
BUILDING AREA
New Construction SF $ 113.03 $ - $
Basement,Finished SF $ 22.96 $ - $ _
Basement,Unfinished SF $ 12.40 $ - $ _
Crawl Sapce SF $ 9.30 $ -
Interior Renovations SF $ 35.09 $ - $ - $
MANUFACTURED HOMES
Ground Anchors SF $ 6.45 $ - $ - $ _
Basement SF $ 12.41 $ - $ - $
Crawl Space SF $ 9.31 $ - $ - $ _
AMENITIES
Kitchen EA $ - $ - $ _
Full Bathroom EA $ $
Half-Bathroom EA $ $
GARAGE
Attached SF $ 54.35 $ - $ _
Detached SF $ 69.53 $ - $
Under SF $ 10.03 $ - $ _
Carport SF $ 19.89 $ -
MECHANICAL
Warm-Air Y/N -
Hot Water $
y Y/N $ -
Electric n Y/N _
Air Conditioning n Y/N $ - $
ELECTRICAL SERVICE
Upgrade Amps
$ -
Overhead,new Amps $
Underground,new Amps $
Subpanel EA $ 599.50 $
Gen Set EA $ 3,850.00 $ _
SOLID FUEL BURNING APPLIANCES
Prefab Metal Fireplace EA $ 6,497.70 $ -
Masonry w/lfireplace EA $ 7,096.65 $ -
Masonry w12 fireplaces EA $ 11,095.70 $ -
Wood Stove,free standing EA $ 2,692.25 $ -
Wood stove insert EA $ 1,859.77 $ -
DECKS,PORCHES,SUNROOMS
Deck SF $ 4307 $ -
Porch SF $ 149.38 $ -
Sunroom SF $ 176.90 $ - $ _
POOLS 6 HOT TUBS
Hot Tub EA $ 8,016.25 $ - $
Inground Pool EA $ 21,373.44 $ - $
Above Ground Round EA $ 5,099.46 $ - $ _
Above Ground Oval EA $ 6,019.75 $ - $ _
Pool Heater EA $ 8,984.25 $ -
Inflatable Type Pool EA $ 1,550.00 $ -
SHEDS
w/o electrical SF $ 20.35 $ -
w/electrical SF $ 20.35 $ - $ _
RENOVATIONS
Roofing,Overlay SF $ 3.00 $ -
Roofing,Strip F.reroof SF $ 4.00 $ -
Roof Sheathing SF $ 1.31 $ -
Siding SF $ 5.50 $ -
Windows EA $ 500.00 $ -
Skylights EA $ 1,051.10 $ -
Doors,Exterior EA $ 601.50 $ -
Oil Tank,275 Gallon EA $
Oil Tank,550 Gallon EA $ _
MISCELLANEOUS CALCULATIONS $ 6,500.00
TOTALS $ 6,500.00 5 - $ - $ -
PERMIT FEE CALCULATIONS
Construction Value Fee
Building $ 6,500.00 $ 56.00
Plumbing y $ - $
Mechanical y $ - $
Electrical y $ - $
Working before Permit Issuance $
Certificate of Occupancy Fee $
Plan Review Fee $
State Education Fee $ 1 43
TOTALS $ 6,500.00 $ 57.43
Figures are based on the 2006 RS Means Residential Cost Data
01;19%2010 11:43 FAX 8606698594 S UO3
anon
FAX NO. :
Jan. 20 2010 12:01AM P2
Town of Montville
a Denartrnerlt
Tel. s8o-849-3O3p E,�gg� 310 Norwich-New London Tpke.
Uncasville CT 03382
Fax. 880-848-7231
£ AZELoCTJON PERMlT,App OVAL
Applicant is responsible for obtaining all of the requuad approvals. No
permit will be Issued until all the rsgvired sigriatorea are obtained.
Property p rty Address
�S e 'IC • / r -. . 4 (5 >r /-�GorY
� tr�uf /2awi be Job Description
er �cv/I7rfi"G9/
Required
Approval Department - Permit I$auance Approval
Tax Collector
GrmmentS: Signature/date
• Planning&Zoning
Signature!date
Comments: (/J L
Fire Marshal
Comments- Signator®/rialto
Health Department
Reattir}I!� erlfe8 §term;. re Ired rP n lactrkul
.� -hani qL Rogtin�sialg.,-111t109aa$Doom,
Comments Signature/date
WPCA, Administrative
apjared r.pazizatlip91T s&Wor
Comments: Signature/date
❑ WPCA, operations
kt3@gli gAbV INPcit
comments: Slgnoture/dato
❑ Department of Public Works —
R&ouirea. Lw tq.Astexsi worm aL� ayyID9ments
Comments:
Signature/date
CI State Dept. of Transportation
ReouiredAr Sa tQh 2,g QY sa ft o •. n- rt a r• -
Ctl/f94qr
Signature/data
Building Department Review Complete
Signature/date
iRn 9,+m .r.t,,,60.c
01/19/2010 11:43 FAX 8606698594 S 004
JENSEN-
CQ
January 13,2010
Mr. Paul Randleman
19 Rainbow Drive
Uncasville CT 06382
Dear Mr. Handleman:
Thank you for your recent request to construct a three-season room over a portion of your existing
deck.Jensen's understands the room will have dimensions of 10'X 16'.
You or your representative may proceed with the obtaining of any and all applicable permits(building,
sanitary and zoning) required by the local governing body. A copy(copies)of the permit(s) issued to you
must then be submitted to Jensen's office prior to the start of the construction.The existing deck is to
be used along with the existing skirting.
The project must be completed in a neat,craftsmanlike manner_ The Lease mandates all construction
shall commence with ninety days from the date of Jensen's authorization letter and shall be completed
within thirty days of that commencement.
Modifications and changes in the exterior of a home become the resident's responsibility to maintain
and shall be kept in good condition and repair at all times.
Sincerely yours,
JENSEN'S INC.
Michael Kane
CT Operations Manager
Cc:Phil Madore, Mike Jones,Work Order 23990
01/19/2010 11:43 FAX 8606698594 S IJ 005
Yg4w +'ts 0,-, ,!i rf T t?�a 1,fQ �'Isrlv;I'l�r�.y��r ali rqrf'iC13, 4+:41:4, +NZ!tiil+Ii��F,7-Li(. � v '
i. A '44..41"_'05 rr r +ritt jr( l!l ::.:41,5i r,6 rr ur r r. ;.,*'51',I, .. itl ' ( i
i ! - _ %L.*:
* _AL*
- '.% +w-- —"ALA -.. _ �f'__ '1.+P . ".1_, : . �l�
.: --- - v9''`•
1- , , t11
AF
{ ,,
41 U I
4.-'sl.,...-: 1I - 1 SI:
• I (.1 [0-1,-!.
7fIFF•�r\II ~
'111t,-�Arvt I cA
I'M, II Z 4 CO
m ^ ,N;
1.4
d
� t
o Ir pr f +pr S i e
\i'W a
\ , 4 S,�, i f „,•, •
: , ^ , t.A ..j-; '
yI vv +� :- fi "' : q { ��pay y4¢, ; ; la `J.
ry b
acl
„ 's' I z 1.1 u (Yi N
; l.
�� .l;/4 , ,I,4•10: V1,1y yfi st• '.i- t9:>. w.y frs r 5+ '..1'�+ lrrr , l01 ,jl?ii kl "
01.19/2010 11:42 FAX 8606698594 S
001
SISK BUILDING & REMODELING, INC.
#6 CARTER HILL ROAD
CLINTON CT. 06413
To: Town of Montville Jan. 19, 2010
Attn: Carmen
$310 Norwich-New London Tpke.
FAXIMILE
Carmen: Thank you for faxing the application. I have filled it out and will drop off a
check later today. Please let me know if there is anything else on my end to help with the
process. My cell # is the best way to reach me.
Sincerely,
Bob Sisk
Cell #860-662-0020
Office#860-669-8594
E-mail bobthemodbuilder@sbcglobal.net
01/19/2010 12:31 FAX 8606698594 S Vjti01
SISK BUILDING & REMODELING, INC.
#6 CARTER HILL ROAD
CLINTON CT. 06413
To: Town of Montville Jan. 19, 2010
Attn: Vern
#310 Norwich-New London Tpke.
FAXIMILE
I am forwarding you the whole description of how the walls are fastened, the layout of the
room, the specs, etc. I hope that I don't run your fax machine out of ink,but it probably is
best that all of the information is put in your hands.
The room is definitely a 3 season room, there is no mechanicals, electricity, plumbing,
insulation in the floor. The room is to have ''A"of luan plywood 10' x 16' over existing
composite decking and indoor outdoor carpet over the plywood.
Sincerely,
Bob Sisk
Cell #860-662-0020
Office#860-669-8594
E-mail bobthemodbuilder(usbcglobal.net
wei)face
9a"°'
JA1 d pT.
V11.011AG'
gDE
01-'19/2010 12:31 FAX 8606698594 S ao02
Left Side Wali Width '� �� r� L�
-•-- ��....-_._�__ y ,. �.,_ - �D : p> ni as to C? ,;T
Ili i'i rD
al -S`Cli O 12- O Q7 i
•
�` 11.
IN 73
t,� (.9 . O) W n r�
\\,\\\_i,.... [ � iii VY
0
r.
•
tr'' ,1 u
AW
i �~ 0 o o .r� E r: I s
I' r' °' l; ; L ��.
� � m 3 �s Q i—
I--
r- II -� „ 'rf w Iv 7; ,T,
II C7 II p �� �.. 7 IT
r � � � � �
:e - xq ch l
-� . O' 'tlB_ o O 3 ry 01---
,c3
' (z
z 74
.':l Imo— R fl •^1{7
r... G• O y• co y r q UJ
((fi . r!,
L„ O d t`:i- .t
Si
0on � MGCi
;riit
GI
70
JO ti 0 ,n ft G. 0 1 d ~1 1. w uy o ro
o rn -0 1 .3--f, t . _ m
VJ 1 "� r
.,.r cn # I m S t
= a) if 11 It Ii C ((p1p i'..; P
- 10 p� el. .� r. cn
tp I . O
97
ff,
no H
2 a V7 0 0 m s I N G o
fp L
ft m
7,. g
w L !
L07
cep n ���t r
iC. _! o Q a z g rn
C g'
,,,,...... ,
, i,„ ,,,,,
....,,, ..t..,.
01 ft Ty
co 2
Right Side Wnll Width
1
01/19/2010 12:32 FAX 8606698591S Z 00
Deluxe Three-Season Sunroom Enclosures with Window Walls
(Continued)
Price per foot includes: suggeoed
40 Wall Panels with windows and Full Screens Walls 76-1/2",82".90",96"or 102"high are all priced the Retail
Corner Joiners same. For other wall heights.contact office for pricing. Price
Wall Channels Per toot
—
Floor Channels
Door Panel for Standard Swinging Door Walls including: Horizontal or vertical sliding window. 168.67
Trite Angles
Gable End Panels and Channels Walls including: Awning Type Architectural or Vertical
183.67
Solid Panels(When netted) Sliding Vinyl Pane Windows,
Stationary Window Panels(When needed)
Sealing Tapes and Caulking Optional Second Standard Swinging Door. 213.33
t_
Hardware
The Deluxe Three Season Sunroom
has an optional Deluxe Swinging Door. 5ug;gctited
Deluxe Three-Season Summons can be ordered Retail
The door is a nominal 36"wide x 1-3/4"thick. with Tempered Glass Windows Price
Wall Heights 76-1/2",62",90",96"or 102"are all priced the same- Per Font
-•
l . Walls Including Horizontal or Vertical Sliding Windows
195.33
- i with Tempered Glass
',i!ii,',' a` `4l. The Deluxe Door has either a Fixed Tempered Glass Window or a Vertical
44 f.e i,' Sliding Vinyl Pane Window. (Please Specify Clear or Dark Vinyl). It also
14A? comes with a Standard Lock Set and Dead Boit, keyed alike.
pi ti
;e ,1 dli ljft' Optional-Deluxe Swinging Door with Tempered Glass Window nr 1`r Door 480.00
�? A�j,J; l Vertical Sliding Vinyl Pane Window-(Specify Clear or Dark Vinyl) tau Door 693.13
is;t tw ff f �°arJr': rt�
t ,''r� x td t, {+t 82",90",96"8: 102"Wall Height
!w"dry *,15r .01, H I sa6.ci7
y, t ,: 1, Optional•Deluxe Swinging Door with Tempered Glass Window or 1'''Door
;?,1 tt ' ' Vertical Sliding Vinyl Pune Window-(Specify Clear or Dark Vinyl)
> 1
76r1/2"Wali Height 2"D Door 7611.00
s._.....,...
Contact factory for number of Ledges required Per Ledg
Specific Right or LEP Hinge, 36"width 45.33
Ou:swinginq or Inswf,iging
Color;While `otet The ink Ledges can be used on the Custom Oak Window ledges 23"width 34.6 r
Horizontal or Vertical Sliding Windows. 12"width 24.0(
Sliding Glass Doors for Deluxe Three Season Sunroom Enclosures
- Optional -
%. NOTES:
��. •Whenv+der ing a,bane enclrxrmr with tow or two,+lidiag ilio, units first
sk
\� figure the room enclosure in the regular mariner. Then,add the following
tk
�, �' additional price for each sliding door unit regaled
•Sliding Door unit consiatS of two tempered glass door panels lone with keyed lock), Suagcstt
one.eliding screen panel with convenient handle and locklug latch,and Retail
complete frurnes. Sliding Door Units are6 feet wide, price
\� Per Doc
\ 6'x 80"Sliding Door Unit 3(16.6'
*Special order door unit
Frame Color-White due to custom size. Required on 76-1/2"Walls 6'x 75"Sliding Door Unit 480.0
Solid Wall Panels
. Solid wall panels can be substituted for windowsag g;csa
panels.Price per linear foot of wall is the same for When an enclosure is to be inuallyd under anyexisting Ret tit
either type of construction. roof,ii May he necessary to order a nen'Front!leader. Price
(Same length as enclaSare franc wall.) Per Pbt
Please indicate the location of solid wall panelsWhose Front Header-SpedSpecify desired length•White or Cream. —
10.0
iiii) when ordering. Price
Deck Trim Angle 1-1/4"x 1-1/2"x 120",Color-White Each
Extensive continuous use of solid wall panels may Recommended to finish the outside edges of existing deck floor.
reduce total price ol'room.Call Dura-Bill for quotation. 18.0
01/19/2010 12:32 FAX 8606698594 S Ul 004
DTSSE-09
DURA- BILI
Assembly and Installation
Instructions
for
Deluxe Three -Season Sunroom Enclosure
Under
Dura-Lock or Dura-Therm
r
111•
Ji>tT.
h
x4Mii.4•am /
IM I I I I 1 I 1111111111 MAI:
Read the instructions before starting the job. They explain the steps required
to produce a finished product that will meet factory specifications.
All references to"Left"and"Right"are while facing the home.
Check the material received. Safety is important!
Match your shipment with the Bill of Materials. Wear Safety Glasses and Work Gloves.
if there is a shortage or wrong material, Follow all safety practices while assembling
call Dealer Service immediately. and installing this product.
Dura-Bilt Products, Inc. P.O. Box 188 Wellsburg, N.Y. 14894
Dealer Service 570-596-2000 E-Mail info@durabilt.com
DURA-BILT RESERVES THE RIGHT TO CHANGE DESIGN AND/OR SPECIFICATIONS WITHOUT NOTICE.
01/19/2010 12:32 FAX 8606698594 S 000
Fasteners
Fastener Description
illiiiiiilliiiiiiiiiii Y.'
1/4"-20 X 1-1/2"Bolt& Locking Nut
ji... #12 X 2"Sloted Hex Head Screw
41iiiiiiiiiiiO4- #10 X 1" Hex Head Screw
*Ma° #12 X 3/4" Self Drilling Screw
�� #8 X 1/2"Self Drilling Screw
��, Plastic Lag Shield
IiiiiiNallaikW #10 X 1-1/2"Flat Head Phillips Screw
(They come with the threshold)
Tools Required
Cordless Drill Tape Measure Metal Saw Level Chalk Line Clamp Hammer
Utility Knife Caulk Gun Silicone Lubricant Spray
Nut Driver Bits with Magnetic Head: 1/4"-5/16" -7/16" Drill Bits: 13/64" - 1/4" Masonry
Page 1
01-19.2010 12:33 FAX 8606698591 01i6
All reasonable efforts must be made to make all the Floor Channel level.
Caution: The mitered Corner pieces must match perfectly because the vertical Corner Joiner extrusion will be
a tight fit in both directions in the floor channel.
All Channel joints must butt tightly together.
Helpful Hint:Place a long straight edge against edge of separate sections of Channel to assure perfect
alignment. When the Floor Channel positioning is correct,you are ready to fasten Floor Channel to deck.
The cut out for the swinging door will be made after the door is located.
ENCLOSURE
{ END WALL
WIDTH
45'
•
Notch I ENCLOSURE LENGTH— titch
Note: Corner Joiners will install only as
shown with the notch at the top.
Left Corner (Applicable for Straight Line Roofs.) Right Corner
Drill 13/64"holes in Floor Channel every 12 inches.
Wood Deck: Caulk the underside of the Floor Channel covering all of the drilled holes and mitered cor-
ners. You must use the#10 x 1"hex head screws with the Magni 599 coating supplied by Dura-Bilt every 12
inches.
x1"HEX
Concrete Patio: 1. Use Floor Channel as a pattern to mark screw / HEAD SCREW
locations on concrete. '' i
2.Remove Channel and use a 1/4"masonry drill bit CHANNEL
and drill holes 1-1/4"deep. `~
PLASTIC LAG
4. 1-Jammer Plastic Lag Shields into holes. —..___' /// SHIELD
5. Caulk the bottom of the Floor channel then Replace Floor Channel
over the Plastic Lag Shields and Fasten with#10 x 1"screws. 11"
oC 4
1 JJ�A
Page 7 i _.- ��
01/19!2010 12:33 FAX 8606698594 S 007
Install Wall Channels
Note: If you are installing a room that Does Not i"x l" Line"A"marked
Foam Tape earlier for
have a solid panel at the home wall, see page 13. Wall Channel
Outside Edge.
Use the following procedure to install both Left and
Right Wall Channels after Floor Channel has been installed. Wall /
Channel '
1.Cut the Wall Channel so it will fit between
Floor Channel and underside of Mounting Rail.
Note: The Wall Channel fits inside the Floor Channel
2. Drill 13/64"holes starting 2"up from the �
bottom and spaced 18"to 24"apart.
Final hole 2"from top. Inside Outside
ii
3.Apply a strip of l"x 1"foam tapeo4 Short leg of
on the back of the Wall Channel along the �� Floor Channel
is to outside.
full length of edge. See Drawing.
4. Position outside edge of Wall Channel so
ExaliAll
it is on the Line you marked on side of home. Left WaDiell
of tte)
(Left Wall Opposite)
5.Attach to home with #12 x 2"hex screws.
See Drawing below.
#12 x 2"
= Hex Screw
Wall of Home
Top View Wall Channel 1"x 1"
of Foam Tape
Right Wall ,;;
�I
#10 X 1'
Screw
T i
Inside Outside
Floor hannel
Page 8
01%19/2010 12:33 FAX 8606698594 S IZ]008
Installine Startet Panel
To Viof
Wall
I.You can begin installing Wall Panels Pew Channel I lome Wall
at either Right or Left Wall Channel. Right Wall
This instruction starts at the Right starter Panel
Wall Channelr �sf k f"s:rs�3.='•;- �� 5'
with the Right Starter s''. �"" .F.•
Panel. This panel has a Panel Frame �`" fir." . f y '• r
W4i . z y.rf- :*'
on one edge, start the other edge f ,,,r te , s-; 1:) i ;
(without the Panel Frame) into the
Wall Channel. Seat the Panel in the ; ;-.: 'r+y�yyl' 2„
Floor Channel. Do not fasten Starter 1)' 1 "
Panel in Wall Channel at this time. 0 '
2. Following your Project Planner, insert ,
• Wall
Panel Frame of the next Panel into 91 �`�.I.f 4 Channel
the Panel Frame of the first Panel just r�fg
,:
installed. Insert to the stops of the Panel ;4, ; / Center of
Frame. Fasten Panel Frame at top, ` - 'IAA Panel
center and bottom of both inside and t ;
outside of Panel Frame using#8 x 1/2" , �'. ,'; '°n
self-drilling screws. Do not install ek,; ; {
screws in Floor Channel at Panel Frame ,.+: (;
until Corner Joiner has been installed. i~' A`r' ' 41
I4'.
2
Floor Channel
A '
I. Before installation of the Door Panel, the Floor Channel Side Walls must be cut for the Door opening.
As indicated below,the door hinge side of the Floor Channel is cut slightly larger to accommodate the door
swing. Locate Door Panel and mark sides of Floor Channel accordingly. Remove Door Panel and cut side
walls of Floor Channel as marked.
2. Continue installing Panels by positioning each Panel, or Corner Joiner, so its legs will slide over legs of
Panel already in place.
3. Illustration on next page shows Enclosure Side Wall installed. View from top shows Frame overlap. Door
Panel(s)will install in the same way shown for Window Panels.
View from — as"---- — roar cs.,nn,,
inside Lewes ate+Floor Channel sldawail
Enclosure e
' 4,--1
- -- ----- ae..
Cut out ror laswlnO.g Door
_ ae..
Floor Channel
View from (ower groove Floor Channel sidewell l/
outside
Enclosure
Page 10
01'19.2010 12:33 FAX 8606698594 S V]009
Note:The Door Panel is 3/16"narrower than the equivalent Window Panel. Allow 3/32"spacing on each
side when installing Door Panel. See Drawing Below.
Corner Joiner Wall Channel
._-_-,.4411'
Door Panel
Panel Frames
Installing Wall and Door Modules
As you continue to work from outside the room,the basics of installing the Wall and Door Modules uses the
same procedure as you have just used to install the first Panel.
'a
�Ib ---- _ �I - — i
4. #8 X 1/2"self-drilling screws I, ) r
installed inside and outside where legs .�;'1 1.,t
1
on Panel Frames overlap. j
FY: ll`II r.0
f "1 I,
I'.•.q.•.q #8 X 1/2'"Screw ; :f�
I1 I;a
Ii CII.;1 I
(Inside and Outside) !flb ;1
l1
rnR;'r
{, I tii3O f 1 1 3 t' '-Y
,! , --'— -'- 's fir ms, -„'04:7%;; ,'': I
s �Z•^"S•µ, '� .�f, a yrs(,'A..1'E.^....%::.
rlw'. . ti.',}.�K f 1 f ,
dr *.*livid max,. t.nr, ;�
1- 4
,10 Page 11
•8 X 1/2”Screw(Inside an Outside)
vow
01/19/2010 12:34 FAX 8606698594 S Vim
Installing a Room Under a Fixed Roof
(This is a special application)
I. Start by cutting four(4)pieces of 1-1/2"x 1-1/4"x 1/16"thick
angle so it will fit between the Floor and the bottom of
the Mounting Rail. Right Wall
(You will need (2) pieces for the right wall and (2) for the left wall) Shown
2. Drill (5) 13/64"holes thru the 1-1/4"leg of the angle in all (4)pieces,
2"down from the top and 2" up from the bottom with the
last(3)holes equally spaced between the first two holes.
See drawing.
3.Apply a strip of 1"x I"foam tape on the back of
=al
1-1/4"side of the angle approx. 1/16" i n from the
1-1/2"side of the angle. kr
(This is to be done to(2)pieces of angle)
F.;
Note: Left wall is opposite.
See drawing.
4.Place the inside leg of the 1-1/2"angle against kine"A," lop view of
that has been already established on page 6 then use a level Right Wall at Home
to plumb the angle,then attach to the home with#12 x 2"
screws,compressing the foam. See drawing at right.
(The foam fills in the gaps of siding or shingles etc.)
Home Wall
5. Install the Floor Channel by placing it against the 1-1/2"
leg of the angle you just attached to the wall. Make sure the
Floor Channel is square with the home and fasten with
#10 x 1"screws. See drawings on next page.
6. Install your first Window or Door Panel into the Floor Channel "-lir
and slide it to the home wall.
7. Install " 1-1/2"Side
7. 1-1/2 x 1-1/4 a l/i6 thick angle against the left side .
of the Floor Channel,making sure it's plumb at the home wall and
fasten with#.10 x 1-1/2"hex head white screws.
8. Repeat Steps 4, 5 and 6 for the left side wall.
Line "A" --> �
Note:All other trim angles will be applied when the room is assembeled.
i
See next page for more assembly examples. Page 12
01 '19/2010 12:34 FAX 8606698594 S LA 011
Installing a Room with no Solid Panel at the Home Wall
(This is a special application)
1. Floor Channel will be used as Wall Channel in this
application.
2.The Wall Channel will be altered at the factory for
you.
This will allow for a proper fit in the Floor Channel. —Altered Floor Channel
(See Illustration at Right)
3. Drill 13/64"holes starting 2"up from the bottom and
spaced 18"to 24"apart. Final hole 2"from top.
4.Apply a strip of 1"x 1"foam tape on the back of the
Wall Channel along the full length of edge.
Floor Channel
Top View
o
Right Wall at Home after Room is Assembled.
1"x 1" #1212" "X 1"
Trim Angle R — Hex ead - Trim Angle
Sc w I
#8 x #8 x 1/2"
Screw �44••a444ti444444\4
i•►aaw4Y••►.44.+4' Screw
.V.44••+r•r+41.4.4
ia.i r�.:.4%4 4��aLV
•♦4444••4 4440.4444.44
4444.44•4 164.44444 Y'
1.
•44
444Y44rr4►4+r4
1,444%.4.641441.4144•.4►•••►Y•..=
�•4r.•rar4w••4.4►• -
• ♦a..wra•r4 L►a•►Y•
.+•44•►•.444►••L•4Y
Inside Room •+4•►4.4uYY4Y.4.•r
:4. Outside Room
• ,4••.•44..4...L.
4.444•.4+4•••4►4•.
14::444►Y4Yl•41444
,e 44 4•44. 44.rr44♦r♦
X4.14.�0004. fi
.44.144.441001.46.4.44%
' 144.44.4..44r Lr4
-.1 ..444►4 Y4ar•L
• 4►44.44••
♦+444•
4
5.Attach Wall Channel to home with #12 x 2"Hex Head Screws.
Page 13
o1%19;2n1n 12:34 FAX 8606698594 S 0 012
� 1 I 11 --.1 1 1 . 1 , •1 11 1 I. - 411. 1 1 ' I 1. 1 11 1 _ •1.1 ; 1.! .1 " f u l l
I. Start at Left Wall Channel and install Panel identified for left Wall Channel only and work toward Door
location. Then go to Right Wall Channel and install Wall Panels, working your way back around to the Door
location.
2.If you are installing a second door, install that door using the same procedure
as you would with a Wall Panel,
Deluxe Front Header Cover ,'.
is supplied to cover the
overhang of Deluxe Front . aid
Header. Attach with
#8 X 1/2"Screws. Deluxe Front Header Cover ~`.
Note:When Deluxe Front Header End Caps
are used with Deluxe Front Header Cover,
The Legs of the Deluxe Front Header Cover
will have to be altered back 5/8"to allow the
Deluxe Front Header End Caps
to lit into the ends of the Header.
'i.
Deluxe Front Header Deluxe Front Header
End Cap
3. If you are installing a Dura-Bilt Roof: After all Enclosure Panels have been installed, place Front Header
that you assembled in Step 15 over the Front Enclosure Wall. Note that Corners have been notched at to&
1.oiccollnmodate Front Header,
4. Level Front Headcr on the Front Enclosure Wall. Then raise center of Header slightly so that water will
flow to downspouts.
Page 14
01/19%2010 12:35 FAX 8606698594 S Z013
5.Attach the Deluxe Front Header to the Panel Frames in the front wall with #12 X 3/4" self-drilling screws
inside and outside where Panel Frame Extrusions overlap. See drawing below.
Top view ofJanel Frames looking through.I?eluxe Front Header
#12 x 3/4"screw
AZ
. .p
• 1 • ♦ 4 4 • 4 .i • ;4:414:4144-44,444444e0.0
411 44:444.444.Ao,"0r�1"�i4I 04,0040440,44,00:440,044,004 „
4444 4 ♦ 4 4444 444
114444_,41114.04441,04444)..04164414441441.4.
jj � jrjji4r4r4 4444444444144404 .
r j 144444444444'i 'r �l 'i1 J I�I�j �I rj
244e4 .
1'41441'• 41414 ,•44414/,• 4 ►404,14'6!444.,14,64 �Il j 4,4'"144. X14 •
j+,..-4-A414r14 144-A�il.i•J ►i,4 ''44,34:11;
-...,14411,11441414 A-
44444444444444444444444. ' ► ,/4 4.1�/+�4:444 I'"r4 144
44444 4j4j441444 •4 44 ► j"r4 4 4 •4 4 e44441,4;4 j4
44• 444 .444444444444444
114,,�441,-44444414, 1414 I al,14. 4 4 4 1 1 4 44'444'444444 '4444444
44444 414444444444,4414,04 :4:444 004444 44444.44444 4 •
$444$4 4 4 1 1 4 . 4 4 4 4 :4444044,0444 ,1 4 41414144.4444414444444:444.
4444444144441:41414
I 440 44 44h 44444, 444
44444444444 4444444s ,r41�1'r1', '4'14r4r►'444 14 44441 I'i1'ii
4444 j�4444444 1 r r _ 1444,44:44,44444044444444,,44
�.�4A1A1_1r
/
#12 x 3/4"screw
Note: If you have an existing roof you can lower it and secure it at this time. If you have a new roof
install the roof panels now according to instructions provided.
Gable Ends
The Gable End Channel is provided in two parts to allow for easier installation of the Gable End when the
Roof Panels have been previously installed.
I. Cut the Gable End Channel to fit from the back of the Deluxe Front Header to the back of the Wall Chan-
nel.
2.Cut two(2)slots 1/8"wide X 1-1/2"deep into the top surface of the Gable End Attach Channel. This is
done so the Gable End Attach Channel fits around the Wall Channel.See drawings on next page.
•
:: A t-1,:i''' . :lit; 4-.01
•
•
1-1/2" 0$.5^ .11
End view of the ` .A. V;:�,`' ,�
Gable End Channel a4�i'' ' a.
for the right i O' 1.41 r '{
Page 15 side wall -- -11~ 1/8" -3.1f- 1/8"
01/19/2010 12:35 FAX 8606698594 S VI 014
Note:The end of the Gable End Channel with the 1/8"slots is inserted around the Wall Channel above the
Room Side Wall Panels and then pushed down over Panel Frames until it rests on Panel Frames.
With 76-1/2"and 82"wall height, Gable End Channel will not seat fully on Panel Frames at the door.
This may cause a high spot in the Gable End Channel. It can be leveled by raising the ends of the Gable
End Channel. However,as you install#8 x 1/2"self drilling screws where two Panel Frames over lap
and intersect Gable End Channel, be sure to hit the Panel Frames with screws.
3, Install two-piece Gable End Channels with open side facing out. The Gable End Channel Clamp piece is
installed after Gable Ends are in place.
4.Gable Ends material for Straight Roof is one piece and must be cut in half diagonally corner to corner.
Gable Ends must now be cut to fit. See drawings below.
Gable End Gable End
Channel
Channel
Le' Clamp Mounting Rail—>
View of right side wall with -
Top ol'wall Gable End Channel pushed
Panels
down over the Panel Frames
.,z #8 x 1/2" and inserted around the ---Wall Channel
Screw Wall Channel.
..................
Gable End Channel
...................
Outside Room
. .... .... ... ..
End view of
right wall
2"
2"
2" II- A
5. Make the following measurements and mark them on the Gable End. Follow this procedure for each End.
Measure distance (A) from inside of Enclosure Wall Channel to back of Front Header. Measure distance (B)
from bottom of Gable End Channel to under side of Roof Panel, Mark these measurements on the Gable
End as shown in drawing.
Cut Notch (C)as shown to fit around Mounting Rail.
6.Cut the Gable End to your measurements. Check final size, it must fit from the back of the Enclosure Wall
Channel to the back side of the Front Header.
7. Follow same measuring procedure for the other Gable End. Page 16
01.19/2010 12:35 FAX 8606698594 S
1015
Gable Ends for Dura-Tkelrm andJ nra-Lo Jt Roofs
Install the Gable End Attach Angles with#8 X 1/2" screws every 12". ./Roof Panel
lien :1 1 t dielggiri
:::4::41T ift : Meier
gi:0:14: : it : 9411.•
4
4 1+1141/401:: !Ipl m
440111:::::SKIRM.4
14.41:elilliiiiNilillar
- ... -=
01 '19/2010 12:36 FAX 8606698594 S 016
Use of Corner Braces may be oilman',
Consider use of Braces as optional on Side Walls up to 12'in length. Braces are recommended for Side Walls
more than 12'in length. Braces also recommended for all walls in "high wind" areas.
Installing Corner Brace on Room with Gable Enc! Channel
1.Install Corner Brace Bracket on back side of Front Header with (2)#12 X 3/4"screws.
2.Attach Corner Brace to Bracket with two (2) 1/4-20 X 1-1/2"bolt with locking nut.
Do not tighten at this time.
3. Swing the free end of Brace to Enclosure Side Wall and position Bracket on Gable End Channel where
holes in Bracket and holes in Brace are aligned.
4.Attach Bracket to Gable End Channel with (2) #12 X 3/4"self drilling screws. Install and tighten all
locking nuts on 1/4-20 X I- 1/2" bolts.
e2,6t..
F cc°� -
l... Corner Brace
..•
Corner Brace Bracket ,• 411111
r
orner :race
e
Brackets
Installing Corner Brace on Room with Side Wall Stiffeaer Angle
r
� .. _ti
Drill 5/16'hole in Stiffener
Angle to aligin with lower hole
in Corner Brace Bracket,
1.Install Corner Brace Bracket on back side of Front Header with (2)#I2 X 3/4"self drilling screws as
shown above. (Instructions continued on next page)
Page 18
01/19/2010 12:36 FAX 8606698594 S Z017
2.Attach Corner Brace to Bracket with(2) 1/4-20 X 1- 1/2" bolts with locking nuts. Do not tigh en at this
tat
3. Swing the free end of Brace to Enclosure Side Wall and position Bracket on
Side Wall Stiffener Angle where holes in Bracket and holes in Brace are aligned.
4.Attach Corner Brace Bracket to Stiffener Angle as shown, Use (2)#12 X 3/4"self drilling screws. Drill
one 5/16"hole inside Wall Stiffener Angle to align with hole in Corner Brace Bracket. Place Corner Brace in
position and install and tighten all locking nuts on 1/4-20 X 1-1/2"bolts.
Installing the Threshold
1. Cut Threshold to 35-1/2". Notch for in-swinging or Out-swinging door, as shown. Install with 1/4"plastic
lag shields and #10 X 1-1/2"flat phillips screws, unless Threshold is installed on a wood deck, in which case,
omit plastic lag shields.
Treads should
always be to the
outside.
inµ 31jw1 a^nom $J ii[ � ,i� w4cS�'ti,.
End view of'-,". v" �;..,.
%' Threshold �` F+k�V,'
Threshold for Outswinging Door
Both sides of the Threshold are to be notched the same.
13/16"
1/2"
Threshold for Inswinging Door
Both sides of the Threshold are to be notched the same.
t2Page 19
.......... ...... -
4'