Loading...
HomeMy WebLinkAboutGarage, Breezeway and Deck 2001 Town of Montville Building Department Phone: 848-7166 310 Norwich New London Tpke Fax: 848-7231 Building / Trades Permit Permit Number BP2001-487 Permit Date 8/16/01 Permit Type Building Permit Code R2 Job Street# 53 Job Location PIRES DRIVE Map/Lot 039/098-001 Job Description Add to Permit#BP2001-441,3 car garage w/room over,breezeway&deck 668sq.ft. Owner Contractor Ted Mish C. D. Builders Address 3-0 Lakeside Drive Address 27 Allyn Drive City Ledyard State Ct. City Norwich State Ct. Zip 06339 Telephone 536-6707 Zip 06360 Telephone 885-0465 Lic/Reg Number 3191 Lic/Reg Type NHC, Exp Date: 9/30/01 Use Group R4 Code 1995 CABO Type Construction 5B Building Value $88,278.00 Building Fee $586.00 Plumbing Value $3,599.00 Plumbing Fee $24.00 Mechanical Value $2,178.00 Mechanical Fee $12.00 Electrical Value $4,007.00 Electrical Fee $24.00 Other Value $0.00 Other Fee $0.00 Total Values $98,062.00 C/O Fee $0.00 Comments: Plan Review Fee $52.80 State Ed Fee $15.69 Total Fees $721.89 Building Official's Signature `` Date /./ / G`' ) It is the owners respo -r .r;l• t•, the ule the following required inspections (minimum 24 hours notice required): Footings -prior to •• .r •concrete ❑ Backfill -footing •rains and waterproofing ❑ Fireplace Throat V Concrete Slab, prior to pouring ❑ Fireplace Final Rough Framing ❑ Chimney -one flue above thimble Rough Electrical ® Firestopping/draftstopping El Electrical Service Vi Insulation [Rough Plumbing and leak test ❑ Pool bonding ❑ Gas piping-pressure test and installation Cl Final Inspection V Rough HVAC d Certificate of Occupancy - PRIOR to use or occupanc Town of Montville Building Departnet Receipt 6 .r- Date / / u No. 0099 14; From: 12VI L JZ Job Address: .53 P/R- r- Djj VST Amount $ 24 '?•9_ CashChcck _ Check # (Cock:one (C.-- Received by .3. ,.,.+4,....tt] Permit # �Z..r� /-1-P-1) Permit Fee Calculation Spreadsheet . aeon ` . ei r7 RESIDENTIAL PERMIT CALCULATION (2 STORY) House Construction A (E=Economy,A=Average,C=Custom) QT4 $/UNIT $/UNIT $/UNIT TOTAL Living Area SF $ 70.55 $ - $ 243,820.80 Finished Basement SF $ $ 13.10 $ - $ Unfinished Basement 2136 SF $ $ 4.30 $ - $ 9,184.80 Plumbing Full Bath 2 EA $ - $ 3,531.00 $ - $ 3,531.00 Half Bath 1 EA $ 2,247.00 $ - $ 2,247.00 Garages Attached, 1 car EA $ - $ 8,054.00 $ - $ - Attached,2 car EA $ $ 13,676.00 $ - $ Attached,3 car -1.. 1 EA $ $ 18,938.00 $ - $ 18,938.C"` Detached, 1 car EA $ $ 10,547.00 $ - $ _ Detached,2 car EA $ - $ 15,809.00 $ Detached,3 car EA $ - $ 21,072.00 $ $ Under, 1 car EA $ - $ 1,226.00 $ $ Under,2 car EA $ - $ 1,673.00 $ Fireplace&Chimney Prefab 1 EA $ - $ 3,480.00 $ - $ 3 480 Masonry,exterior EA $ - $ 3,555.00 $ - $ Masonry,interior EA $ - $ 3,330.00 $ - $ W/2 fireplaces EA $ - $ 2,520.00 $ $ Dormers Gable SF $ - $ 22.00 $ - $ Shed SF $ - $ 15.00 $ - $ Breezeway/Decks Open - 456 SF $ - $ 13.65 $ - $ 6,224.40 Enclosed SF $ - $ 82.80 $ - $ Porches Open "5 668 SF $ - $ 22.95 $ $ 15,330.60 Enclosed SF $ - $ 111.55 $ - $ - Heating Adjustment 3456 SF $ - $ (2.67) $ - $ (9,227.52) Air Conditioning 3456 SF $ - $ 145 $ - $ Electrical 3456 SF $ - $ (4.91) $ - $ (16,968.96) Plumbing 3456 SF $ - $ (4.41) $ - $ (15,240.96) TOTAL BUILDING CONSTRUCTION COST,LESS MEP $ 261,319.16 (Is air conditioning included(YIN)? $ - / PERMIT FEE "Sill. //� ... --...,- Building $ 261,319 $ 1,570.00 Y Plumbing $ 15,241 $ 94.00 3 tr 9 11.2 y Y Mechanical $ 9,228 $ 58.00 r• , + T Y Electrical $ 16969 $ 100.00i Otheras? "�' r / . $ CO Fee $ 10.00 904 .,, ,•2� Plan Review $ 157.00 State Ed Fee $ 302,757 $ 4844 _5)"' o T Total Fees /9/if 5 V $ 2,037.44 .5"i" � / 7029 ) / el VX ,:,.s, ---/5>i)< OK • Based on 2000 RS Means Square Foot Costs 8/16/01 j,.