HomeMy WebLinkAboutGarage, Breezeway and Deck 2001 Town of Montville
Building Department
Phone: 848-7166 310 Norwich New London Tpke Fax: 848-7231
Building / Trades Permit
Permit Number BP2001-487 Permit Date 8/16/01 Permit Type Building Permit Code R2
Job Street# 53 Job Location PIRES DRIVE Map/Lot 039/098-001
Job Description Add to Permit#BP2001-441,3 car garage w/room over,breezeway&deck 668sq.ft.
Owner Contractor
Ted Mish
C. D. Builders
Address 3-0 Lakeside Drive Address 27 Allyn Drive
City Ledyard State Ct. City Norwich State Ct.
Zip 06339 Telephone 536-6707 Zip 06360 Telephone 885-0465
Lic/Reg Number 3191
Lic/Reg Type NHC, Exp Date: 9/30/01
Use Group R4 Code 1995 CABO Type Construction 5B
Building Value $88,278.00 Building Fee $586.00
Plumbing Value $3,599.00 Plumbing Fee $24.00
Mechanical Value $2,178.00 Mechanical Fee $12.00
Electrical Value $4,007.00 Electrical Fee $24.00
Other Value $0.00 Other Fee $0.00
Total Values $98,062.00 C/O Fee $0.00
Comments: Plan Review Fee $52.80
State Ed Fee $15.69
Total Fees $721.89
Building Official's Signature ``
Date /./ / G`' )
It is the owners respo -r .r;l• t•, the ule the following required inspections (minimum 24 hours notice required):
Footings -prior to •• .r •concrete
❑ Backfill -footing •rains and waterproofing ❑ Fireplace Throat
V Concrete Slab, prior to pouring ❑ Fireplace Final
Rough Framing ❑ Chimney -one flue above thimble
Rough Electrical ® Firestopping/draftstopping
El Electrical Service Vi Insulation
[Rough Plumbing and leak test ❑ Pool bonding
❑ Gas piping-pressure test and installation Cl Final Inspection
V Rough HVAC d Certificate of Occupancy - PRIOR to use or occupanc
Town of Montville Building Departnet Receipt
6 .r-
Date / / u
No. 0099
14;
From: 12VI L JZ
Job Address: .53 P/R- r- Djj VST
Amount $ 24 '?•9_ CashChcck
_
Check #
(Cock:one
(C.--
Received by .3. ,.,.+4,....tt]
Permit # �Z..r� /-1-P-1)
Permit Fee Calculation Spreadsheet . aeon ` . ei r7
RESIDENTIAL PERMIT CALCULATION (2 STORY)
House Construction A (E=Economy,A=Average,C=Custom)
QT4 $/UNIT $/UNIT $/UNIT TOTAL
Living Area SF $ 70.55 $ - $ 243,820.80
Finished Basement SF $ $ 13.10 $ - $
Unfinished Basement 2136 SF $ $ 4.30 $ - $ 9,184.80
Plumbing
Full Bath 2 EA $ - $ 3,531.00 $ - $ 3,531.00
Half Bath 1 EA $ 2,247.00 $ - $ 2,247.00
Garages
Attached, 1 car EA $ - $ 8,054.00 $ - $ -
Attached,2 car EA $ $ 13,676.00 $ - $
Attached,3 car -1.. 1 EA $ $ 18,938.00 $ - $ 18,938.C"`
Detached, 1 car EA $ $ 10,547.00 $ - $ _
Detached,2 car EA $ - $ 15,809.00 $
Detached,3 car EA $ - $ 21,072.00 $ $
Under, 1 car EA $ - $ 1,226.00 $ $
Under,2 car EA $ - $ 1,673.00 $
Fireplace&Chimney
Prefab 1 EA $ - $ 3,480.00 $ - $ 3 480
Masonry,exterior EA $ - $ 3,555.00 $ - $
Masonry,interior EA $ - $ 3,330.00 $ - $
W/2 fireplaces EA $ - $ 2,520.00 $ $
Dormers
Gable SF $ - $ 22.00 $ - $
Shed SF $ - $ 15.00 $ - $
Breezeway/Decks
Open - 456 SF $ - $ 13.65 $ - $ 6,224.40
Enclosed SF $ - $ 82.80 $ - $
Porches
Open "5 668 SF $ - $ 22.95 $
$ 15,330.60
Enclosed SF $ - $ 111.55 $ - $ -
Heating Adjustment 3456 SF $ - $ (2.67) $ - $ (9,227.52)
Air Conditioning 3456 SF $ - $ 145 $ - $
Electrical 3456 SF $ - $ (4.91) $ - $ (16,968.96)
Plumbing 3456 SF $ - $ (4.41) $ - $ (15,240.96)
TOTAL BUILDING CONSTRUCTION COST,LESS MEP $ 261,319.16
(Is air conditioning included(YIN)? $
- /
PERMIT FEE "Sill.
//� ... --...,-
Building $ 261,319 $ 1,570.00
Y Plumbing $ 15,241 $ 94.00 3 tr 9 11.2 y
Y Mechanical $ 9,228 $ 58.00 r• , + T
Y Electrical $ 16969 $ 100.00i
Otheras? "�' r / .
$
CO Fee $ 10.00 904 .,, ,•2�
Plan Review $ 157.00
State Ed Fee $ 302,757 $ 4844 _5)"'
o T
Total Fees
/9/if 5 V
$ 2,037.44
.5"i" � / 7029
) / el
VX
,:,.s, ---/5>i)< OK •
Based on 2000 RS Means Square Foot Costs
8/16/01 j,.