Loading...
HomeMy WebLinkAboutGenerator 2013 Field Inspection Notice Town of Montville Building Department 860-848-3030 Ext. 382 Address: 49 Pires Drive Job Description: Install 20 KW Standby Generator Permit Number(s) E2013-0244 Permit Date: October 2,2013 Not Approved Approval INSPECTION Date: Comments Special Date Conditions Electric 10/3/13 DJ Bonding and grounding • 10/3/13 DJ Final inspection and certificate of approval 10/3/13 DJ Rev.Date: 1/18/06 Page 1 of 1 TOWN OF MONTVILLE Building Department 310 NORWICH-NEW LONDON TURNPIKE UNCASVILLE, CT 06382-2599 TEL. (860)848-3030 X382 FAX. (860) 848-7231 ELECTRICAL PERMIT Permit Number: E2013-0244 Date: 02-Oct-13 Map/Lot: 039/098-003 Owner ID: 5518000 Project Location: 49 PIRES DRIVE Unit: Job Description: Install 20 KW Standby Generator Owner Nam Christopher&Susanne L Moran _ Tenant Name N/A Careof: 49 Pires Drive - Oakdale CT 06370- Telephone: 860)460-9825 Applicant Name: Charles Carroll Telephone: (860)886-2232 DBA: AC/DC Industrial Electric Lic/Reg Type El Lic/Reg No 122124 44 Yantic Flats Road, Unit 1 Exp Date: 30-Sep-14 Yantic CT 06389- Construction Value Permit Fees Construction Information Building Value: $0.00 Building Fee: $0.00 Use Group: IRC Plumbing Value: $0.00 Plumbing Fee: $0.00 Code: 2005 State Building Code Mechanical Valu $0.00 Mechanical Fee $0.00 Electrical Value: $9,300.00 Electrical Fee: $120.00 Construction Type IRC Total Value: $9,300.00 Penalty Fee: $0.00 Permit Code: R5 C of 0 Fee: $0.00 Comment Plan Review Fe $0.00 State Ed Fee: $2.42 Total Fee Paid: $122.42 It shall be the owners repsonsibility to schedule the following inspections a minimum of 2 business days in advance: Field set of approved constriction documents shall be available onsite during all inspections. BUILDING PERMIT INSPECTIONS PLUMBING.MECHANICAL,ELECTRICAL PERMIT INSPECTIONS ❑ Footing-Prior to pouring concrete ❑ R Plumbing and leak test ❑ Deck Piers ❑d R Electrical ❑ Backfill-Footing drains and waterproofing ❑ Elec Trench-with conduit installed ❑ Concrete Slab-Prior to pouring concrete ❑ Pool Bonding ❑Anchor Bolts-with sill plate and prior to floor framin ❑ Electrical Service CRS No: 0 El Framing ❑ R HVAC ❑ Masonry Fireplace Throat or Chimney Thimble ❑ Gas Piping and leak test El Fireblocking Draftstopping INSPECTION REQUIRED UPON COMPLETION ❑ Insulation 0 Certificate •f Approval ert ic• - of Occupancy Building Official's Approval: u�� Town of Montville Building Department 310 Norwich-New London Tpke. Tel. 860-848-3030, Ext 382 Uncasville, CT 06382 Fax. 860-848-7231 RESIDENTIAL PERMIT APPLICATION FORM E3O No.:Permit - l Type of Work Occupancy Type Permit Type El New Construction ❑ Single Family El Building El Addition El Two-Family ❑Plumbing El Alteration ❑Townhouse ❑Mechanical ❑Accessory Structure ❑ Electrical CRS#: Property Address: 4i� iqn("3' AA /1)x,' (Number) (Street) � " ( - _(_: (Unit) Job Description: /> //VL•L O/ '� h6,1.4,<!-- ,))/�i`,/1/,t!i' E���3.,,ro'Fon) Owner: C'!Ll S &- >fiA. Address: //WS 1.)it /L'6' City:_ )� �)4_�/ Z k State: C! . Zip Code: Q6?)6 Telephone(YC0) '62 ?RAS , Applicant: (ci//9/u4.s ( 2ttn,&it_ DBA: 7'19',// ) ..L; VI rib/A)L l' t-�G/J A /L Address: `7' L/%A✓T L /'4/973 28. C,v;1 i 7. City: .� G 7)C•- State: /- Zip Code: e36j J Telephone(?6 ') 0261 ,19-(:2tJt? Contractors - Complete the Following: , License Type: 24License.2: CJ -Expiration Date: 47(./ 1 9 I hereby certify that the proposed work will conform t. he S''te Building Code and all other codes as adopted by the State of Connecticut and the Town • ontville and further attest that the propos•. work i- authorized by the owner in fee and that I am authorized to make application for a •e it .r such work as described above. pr ❑ By checking this box, I will follow th- equ'eme is • e 2005 NEC as the alternative compliance per section E3301.2.1 of the Residential Code, instead of the electrical requiremen in c -pte . i rough 42 of the Residential Code. Owner/Agent Signature: D 67/X1 ,1 Date: Construction Value Permit Fees Building Value: Building Fee: Plumbing Value: Plumbing Fee: Mechanical Value: Mechanical Fee: Electrical Value: YDS �,J J Electrical Fee: Total Value: Penalty Fee: C of 0 Fee: Plan Review Fee: State Ed Fee: Total Fee: wised August 23,2007 Town of Montville Building Department File Receipt Date: 30-Sep-13 ReceiptNo: 8832 Received From: AC/DC Electrical Job Address: 49 Pires Drive Town Fees Collected State of Connecticut Fees Collected Bldg Cash: $0.00 State Cash: Bldg Check: $0.00$122.42 State Check: $2.42 Bldg Credit: $0.00 State Credit: $0.00 Fire Cash: $0.00 Fire Check: $0.00 Fire Credit: $0.00 Construction Value: $9,300.00 Demolition Value: $0.00 CheckNo: 570 Received By: Carmen Kneeland 0--(1,A nut yl hel n�f�8 IIL ,..mIU Address: 49 Pires Drive ITEM QTY $/UNIT TOTAL BUILDING AREA Building Plumbing Mechanical Electrical Basement,Finished SF $ 41.96 $ Interior Renovations SF $ 36.09 $ $ S $ AMENITIES Kitchen EA Full Bathroom EA $ $ $ - Half-Bathroom EA $ - $ - - GARAGE Detached SF $ 71.53 $ $ MECHANICAL Warm-Air n Y/N $ Hot Water n Y/N $ Electric n Y/N Air Conditioning n Y/N $ $ ELECTRICAL SERVICE Upgrade Amps $ Subpanel EA $ 699.00 Gen Set EA $ 3,850.00 $ $ SOLID FUEL BURNING APPLIANCES Prefab Metal Fireplace EA $ 6,497.70 $ - Masonry w/lfireplace EA $ 7,096.65 $ - Masonry w/2 fireplaces EA $ 11,095.70 $ - - Wood Stove,free standing EA $ 2,692.25 $ Wood stove insert EA $ 1,859.77 $ DECKS,PORCHES,SUNROOMS Deck SF $ 44.07 $ - Porch SF $ 149.38 $ - Sunroom SF $ 176.90 $ POOLS&HOT TUBS Hot Tub EA $ 8,016.25 $ Inground Pool EA $ 31,550.00 $ - $ $ Above Ground Round EA $ 6,299.46 $ - $ Above Ground Oval EA $ 7,019.75 $ Pool Heater EA $ 8,984.25 $ - $ $ - Inflatable Type Pool EA $ 1,200.00 $ - $ SHEDS w/o electrical SF $ 25.55 $ - w/electrical SF $ 26.85 $ RENOVATIONS Roofing,Overlay SF $ 3.50 $ - Roofing,Strip&reroof SF $ 4.50 $ - Roof Sheathing SF $ 1.51 $ Siding SF $ 6.75 $ - Windows EA $ 550.00 $ - Skylights EA $ 1,051.10 $ Doors,Exterior EA $ 601.50 $ - Oil Tank,275 Gallon EA $ Oil Tank,550 Gallon EA $ MISCELLANEOUS CALCULATIONS $ 9,300.00 TOTALS $ $ $ $ 9,300.00 PERMIT FEE CALCULATIONS Construction Value Fee Building $ $ Plumbing y $ $ Mechanical y $ $ Electrical y $ 9,300.00 $ 120.00 Working before Permit Issuance n $ Certificate of Occupancy Fee $ Plan Review Fee $ State Education Fee $ 2!� TOTALS $ 9,300.00 $ 122.42 Figures are based on the 2006 RS Means Residential Cost Da . STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION ELECTRICAL UNLIMITEa CONTRACTOR CHARLES A CAtQFI;ML JR 379 S BURNHAM OW SBON ..:,._,4 ' _ ,Ii i,,= LIC./REG 6 FFECTIV x'� 0 / EXPIRES ELC.O • / i i1/ t13z ,.-1 '"09/30/2014 SIGNED ,,f.., • • . . • . INSTALLATION GUIDELINES • " • Air-cooled Generators • . 1.. c. ..ir- ::,:.J.r•-.::__.... _-;yl,y, ^9,•rx:•::•:t) '.;• .:....,.,M,': �� 'sem� i E r c-' /' moi• •1•:•7;:t:gaiRfatigirbii'ii•fP 4' ............V..-.._.. ._....-.... .._.. ........."..,....-..n,..... 77'7 r.___,rte 7777_ :.. . :.>e:c, 7777 •,__ :. ._.-. .... ... . 7777,...-..:.:: .._.........•:._.._...._ ._ ,.....:ns.,.. _,.,.r... .._ ,...,..._:rr 7777_..r....:. '� -•:7777... _.._:,:'::_r4. _ - -- .;`,inr::`'-'=.:,�:'-- .. ...,•-.: 77,77. ,:.,,, ...... :'--... 7,:777... 7777 ....._.r............. ._s..n.-777.. - - ..:...._ .....�.,.......... _7777..,:,-- 7777 ,- . ......_..,.... ..._.y...: -f:%:::%::_,;..,::-.':,'�. - - . 7777.. '--•--..., 777..,,, , -'- - - _.....��.::� .�'�--._::..._rrw,.::•-.-_.�.-_ . 777 ........•.::!�'._ - - _ �- - "r 77,77 • . _._7777 -- r..:_......,d............ 7777...,.x:a:.:'.1,........;t�. _ • 7777_.._ _'. .a.:' ...,..:::.- .. .. ...........:'::�::•.:� ,.- __cti;,: 1� .Feh':"=4::'r°•:::c.�.�. 7777„'.-....,.. 7_777 - -- - • '---rR+............+_._zr__6:...L: .-• :.A!...,,...:._.,....::n::::-.-.-:, ..,�"_"'�. 77_77. 7777...__ , ,_ {J........ __ ,.If':r �, ... w -77,,,,77 ,. _. _._.....r.._777,,7 .:-' - - - ,,.,1„:;;„:1:.;:;.:;:,.,..:,f..„,,...,...,- ....�,,._:- .:.•._:.:.. -...__. :_ .. � _7777,... .. .r.r a - - - rj� .. 7777.. -...-,7777.:-7777,...:_..? If- ».. 7777 .......ax._._... ..as 7777.-.,.........,.._ 7777 .... : ,.:.:'-�:d'1.� - - ,,,... 7777. ...,....__.-. ........,...._.�.,.", 7777 ._m' 7777 :,..� _ 7777 .., 77 _.. ,..•.......•..�. .. 7777:.:.. ,-............ , .-..: r.::...........'.:,,:-...,.::-�• ::Nrr:__ ... ,1. .�, 7777._.. 7 . 7777.,i.i:�f::. - - r:r": • -.,�:'.f..7777,.,.:,.:. '- : . ..._ .......,..::7777.. r....._...:',.......... ........ ...I _ -_ ,g.) .'. '.ice: 7777 _..,,r�..__.IW.,--.. .......n•" -• r.i:_.. .v:,_:.��'.!.•.. 7777...•a�......::'r,7_7.77... :ir�: __� J� _ _ ...7777... ... ..... ......:1,..__... ..V5_ , 7777...„i... 7777.. �- _77_77.�-,7777.. ... ..., .__..-..�....,.;.. -:ik:_c - ____ --._.,-:. .., :-.,, ....,.�..............�, 7777, .._,fr>t._..,+..rr.. �. -- »77,77 s � _..._ � ....1•r... • .-� 1.:. 7777•..•, .....r - 1. - -- .. . _...r::,.., 7777. ..v ..::. 7777.., .. ................. .....� ... .. „ :.. .-. •::. 7777 ..�._.._.,.,, 7777.,7777... .....,,. .._........... . ,I:.,:: -- _ -- :ilt�_::r::,,r1,?r..::�- .ru,.-'.•-:..•-....�.-r.�,•,....,�...._„ --,.. .;..M1..,,... .._..r1t...n....-7777.,, .. -::1�� :�:P;� ,lL •.arc. 777...: ..r S._ ......,,, 7777....L... 777.,.r................. 7,7_7:,,S.. ..,,,.ru....,•",,... .:,, 7777..L:..................................... 7777...., +r;�`'.'a� __ - -".MM"`- .:Ir1:4i 7 ''' ."!........�......._nr1...:.... ......::......::••,r...n - _ - - _ 777 ._.,.r:-.. 7777..--...-77_77 .._�.,,....:..::•<r..,r .:... :1a:� - - - - _..._. :... .g 7777_.. 7,7,77.. >: 77,77 .....,n .7777. -....,I:c::-...,..... 7777. •.::.'�:.. 7777 _,.............. ._7777._.. ... . ....... 7777. ..._::.r»,- :+"'" _ 77.77,. .. ...,.........._...... .;�i' ... ...._..c .......,•._-7777.•,.. .......,7777.._. ...__ .... 7777. .�...............:��.....-..:,,..,_..... 7777.. ,nn•_.-,:�:::.., ::riS'l:�.i;C�r ::�;. 7777. ._ ...r,.._._...-........_...,.. .........._.ar _.........7777..a....................................: ... - I,.,wr. __F:A:� rii�'!?i%�;:.:.::..: .7777 7:777 •..._........-7777...�......... .'::,.._. .._...: 7777. ... _..._!s..r 777_7 r....__... .,.. ..:_r•s ::�'=- - __ - ... ` 7 77 7, 9"...._ eH._..__.. .._. r 7:: : ......1.J:-': - _ n_'_,; 7777.. 777 .-..._, _7777 ...,..... �:�::�,,;... ......... :::,.. 7777.;,:' 7777, �i'4 ... -..,., ,7777.,.•rr.. .... . ...s:.._7777. ......�..,7777..... ._1.nr •... 7777..-,.... ... . --+.... _..n=: - �,�.',:.ij��,.,_ ..1:u.:f .._..a ..._...r 7777...: 7777................ ,........ _777,7. -7777.. _ 77,77,,. 7777.. J _..., 7777.. 7777..,. ::..�...., 7777. _7777.. .._^.:::5::,........ i!i.• _ "T'� ::a.i_ ,. .::w r ........,,•r.._ ..a...._ .............._.h ...O.r v:..... r....._.,.,.�...._.... ... .{,. - -''f. _.�: Yom.,.., :1f3 ........t_.._v,._.:777_7. 7777. rs..... 7777.. ... ....,r ...a1t 777,7 77_77.. _ __ .. . .......: WARNING! California Proposition 65 Engine exhaust and some of its constituents are known to the state of California to cause cancer, birth defects, and other reproductive harm. WARNING! California Proposition 65 This product contains or emits chemicals known to the state of California to cause cancer, birth defects, and other reproductive harm, FAQ; Q: Do I have to supply the generator with the 100% loaded BTU rated fuel supply and pipe size? A: Yes, the generator needs the 100%loaded BTU fuel rating to start, run and handle loads. The fuel pipe must be sized for 100% load, regardless of the load. 0: Can I use a fuel shut off valve that is not"Full Flow Rated"? A: No, it must be a Full Flow Rated valve and must also match the required fuel pipe ID dimensions, Q: Do pipe elbows,tees, drip legs, etc. affect gas pipe size and flow? A: Yes,they are restrictions to gas flow.You must add 2.5ft. (.76m)per each elbow, tee, etc. to the overall calculated distance from the source to the generator. Q:Can leave the unit on the shipping pallet and install it? A: No, it must be installed per local jurisdiction, code and the instructions as outlined by the manufacturer. Q:Can the generator be mounted indoors or in a structure? A: No. it is designed, manufactured and sold for outdoor use only! Q:Can I run the Main AC and Control Wires in the same conduit? A: Yes, this wiring can be run in the same conduit if the appropriate rated wire and insulation is used and it meets code. Q:Can the Transfer Switch be mounted outdoors? A: Only if its a NEMA 3R rated transfer switch. 1 Z5/EO 39dd 313 1VIa19r1QNI DV Z6117E8EO98 tT :9T ETOZ/OE/6O Section 3 Site Selection and Preparation 3.7 SITE SELECTION No operable windows or openings in the wall permitted within 5f1.(1.52m)from any poinl of the generator, ' r \` 60in.(1524mm) Existing Wall 16in,(457mm) Minimum Distance 60in.(1524mm) 36in. Top of Generator Clearance from operable (g14mm) 361r1, __,—e. doors or any (914mm) openings in the well, Clearance from the ends and front or the generator must be 36in.(914mm).This would include shrubs, These guidelines are based upon fire 36in trees end any kind of vegetation shorter than 12ln. (305mm)In height.Vegetation taller than 12in. testing of the generator enclosure and (914mm) the manufacturer's requirement for air (3om 5m)in height must nave a clearance of 601n. flow forproper operation.Local CodesI (1524mm).Clearance at the top should be a minimum of 60in.(1524rnm)from any structure, may be different and more restrictive overhang or projections from the waif.The generator than what is described here. should not be placed under a deck or other Structure that is closed in and would limit or constrain sir flow, AkiWAIIIIIMIPAIMMMgllgPrAlftlgMIIIIIIftwAIMP �� rl15l 601n.(1524mm) Minimum 60in.(1524mm) ____------3 Recommended 0 Minimum From Ends 1---`—' J Gen Rratr]r 181n. (457mm) Minimum Figure 3.1 -Installation Guidelines 10 ZS/ZT 39tdd 313 1VIciISflUNI DU DV ZsTtE8E098 VT:9T ETH/0EI60 install the generator set,in its protective enclosure,outdoors,where adequate cooling and ventilating air is always available(Figure 1.9).Consider these factors: • The installation of the generator must comply strictly with NFPA 37,NEPA 54,NFPA 58 and NEPA 70 standards. • Install the unit where air inlet and outlet openings will not become obstructed by leaves,grass,snow,etc.If prevailing winds will cause blowing or drifting,consider using a windbreak to protect the unit. • Install the generator on high ground where water levels will not rise and endanger it it should not operate in or be subjected to standing water. • Mow sufficient room on all sides of the generator for maintenance and servicing,This unit must be installed in accordance with current applicable NFPA 37 and NFPA 70 standards,as well as any other federal,state and local codes for minimum distances from other structures.DO NOT install under wooden decks or structures unless there is at least 5ft.(1,52m)of clearance above the generator,3ft.(.91m)of clearance on sides and front,and a minimum of 18in,(457mm)of clearance at the back of the unit. • Install the unit where rain gutter down spouts,roof run-off,landscape irrigation,water sprinklers or sump pump discharge does not flood the unit or spray the enclosure,including any air inlet or outlet openings. • Install the unit where services will not be affected or obstructed.including concealed,underground or covered services such as electrical,fuel, phone,air conditioning or irrigation.This could affect Warranty Coverage. • Where strong prevailing winds blow from one direction,face the generator air inlet openings to the prevailing winds. • Install the generator as close as possible to the fuel supply to reduce the length of piping. REMEMBER THAT LAWS OR CODES MAY REGULATE THE DISTANCE AND LOCATION. • Install the generator as close as possible to the transfer switch.REMEMBER THAT LAWS OR CODES MAY REGULATE THE DISTANCE AND LOCATION, • The generator must be installed on a level surface.The generator must be level within a.5in(13mm)all around. • The generator is typically placed on pea gravel,crushed stone or a concrete pad.Check local codes to see what type is required,If a concrete pad is required,ail federal,state and local codes should be followed. 3.1.1 INSTALLATION GUIDELINES FOR STATIONARY AIR-COOLED 8, 11, 13, 14,15, 16, 17 AND 20 KW GENERATORS The National Fire Protection Association has a standard for the installation and use of stationary combustion engines.That standard is NFPA 37,its requirements limit the spacing of an enclosed generator set from a structure or wall(Figure 1.10), NFPA 37,Section 4.1.4,Engines Located Outdoors:Engines,and their weatherproof housings if provided,that are installed outdoors Shall be located at least 5ft.(1,52m)from openings in walls and at least 5ft.(1,52m)from structures having combustible walls.A minimum separation shall not be required where either of the following conditions exist: 1, The adjacent wall of the structure has a fire resistance rating of at least 1 hour, 2. The weatherproof enclosure is constructed of noncombustible materiels and it has been demonstrated that a fire within the enclosure will not ignite combustible materials outside the enclosure. Annex A—Explanatory Material A4.1.4(2)Means of demonstrating compliance are by means of full scale fire test or by calculation procedures, Because of the limited spaces that are frequently available for installation,it has become apparent that exception(2)would be beneficial for many residential and commercial installations.With that in mind,the manufacturer contracted with an independent testing laboratory to run full scale fire tests to assure that the enclosure will not ignite combustible materials outside the enclosure. NOTE: Southwest Research Institute tesing approves 18in.(457mm)installation minimum from structure,Southwest Research is a nationally recognized third party testing and listing agency. The criteria was to determine the worst case fire scenario within the generator and to determine the ignitability of items outside the engine enclosure at various distances.The enclosure is constructed of non-combustible materials,and the results and conclusions from the independent testing lab indicated that any fire within the generator enclosure would not pose any ignition risk to nearby combustibles or structures,with or without fire service personnel response. 11 /ET 3.9v9 313 1vId1SflQNI DO DV 36I E8E098 bT:9T ETOZ/0E/60 7-1 —7)24 soutnwa l7MyW Son Ar,t o,Te +tntte SMvR1 tEl No. 13204-01-01 Stationery `cnein,p Generator Assembly MODEL MJM'ciER TBA Manufactured Ely Go.,o,o,Pew Cysto,.,YK, WI,Y...t.". Wi Compliant With Clause (21 of Section 4.1.4 of 1FPA 37 Figure 3.2—Southwest Research Institute Decal(located inside the generator, next to the generator's data decal) http://www.swri-org/4org/d01/fire/listlab/listprod/director,him Based on this testing and the requirements of NFPA 37,Sec 4,1,4,the guidelines for installation of the generators listed above are changed to 18in.(457mm)from the back side of the generator to a stationary wall or building.For adequate maintenance and airflow clearance,the area above the generator should be at least Off.(1.22m)with a minimum of 3ft,(.91 m)at the front and ends of the enclosure.This would include trees,shrubs and vegetation shorter than 12in.(305mm)in height.Vegetation taller than 12in.(305mm)in height must have a clearance of 60in.(1524mm).Vegetation not in compliance with these clearance parameters could obstruct air flow.In addition,exhaust fumes from the generator could inhibit plant growth.See Figure 3.1 and the installation drawing within the owner's manual for details. Generator exhaust contains DEADLY carbon monoxide gas.This dangerous gas can cause unconsciousness or death,Do not place the unit near windows,doors,fresh air intakes(furnaces,etc.)or any openings in the building or structure,including windows and doors of an attached garage. ®If the generator is not set to the OFF mode,it can crank and start as soon as the battery cables are connected.If the utility power supply is not turned off,sparking can occur at the battery posts and cause an explosion. 3.2 SITE PREPARATION • Locate the mounting area as close as possible to the transfer switch and fuel supply, • Leave adequate room around the area for service access(check local code),and place high enough to keep rising water from reaching the generator. • Choose an open space that wilt provide adequate and unobstructed airflow, • Place the unit so air vents won't become clogged with leaves,grass,snow or debris.Make sure exhaust fumes will not enter the building through eaves,windows,ventilation fans or other air intakes(see the"Site Selection"section), • Select the type of base,gravel or concrete,as desired or as required by local laws or codes.Verify your local requirements before selecting. 3.11 CRUSHED STONE OR GRAVEL • Dig a rectangular area approximately 5in.(127mm)deep and about 6in.(152mm)longer and wider than the footprint of the generator.Cover with polyurethane film,if desired,and fill with pea gravel or crushed stone.Compact and level the stone.A concrete pad can be poured if desired or required.The pad should be 4-5in.(102.127mm)thick and extend 6in. (152mm)beyond the outside of the generator in all directions. NOTE: If a concrete pad is required,follow all applicable Federal,State or local codes, 12 ZS/t) 39dd 313 1vId1SfUNI DC DV Z6Zh��c 8C998 bT:9Z BT03,f0£/E0 • r 4 a roti_ iiiiimiar u� Figure 3.5—Facia Installation After completing GENERATOR PLACEMENTP roceed to Step 4: SECTION 5 — FUEL CONVERSION/GAS REQUIREMENTS/ CONNECTIONS Section 5 Fuel Conversion / Gas Requirements / Connections 5,1 FUEL CONVERSION The generator was configured for natural gas operation at the factory. Switching over to LP Vapor is a simple procedure. NOTE:The orange fuel conversion knob is located on the top of the fuel mixer on the V•twin engine and under the fuel mixer on the single cylinder engine. Turn the valve towards the marked fuel source arrow until it stops,If needed,use pliers to break free in correct direction of arrow.Fuel knob will rotate 180'and slide into the mixer body when converting to LP. 15 ZS, T 3.9d 3-3 1t1Idi5f1QNI :Q OV ZETDE8E098 VT:91 ET0Z/0E/60 FUEL KNOB LOCATIONS SHOWN FROM GENERATOR AIR BOX SIDE VIEW FUEL KNOB 8 kW GENERA 0 R i. I. _7itt Wit - A 1111111111 #1'1:7 P, �, NG L ` ,; il / _ ." Lv. 11-20kW GENERATORS 17 il;�Ma ` ORANGE FUEL FUEL KNOB CONVERSION KNOB Figure 5.1 —Fuel Conversion Knob Location for Single and Twin Cylinder Generators 5,2 FUEL REQUIREMENTS AND RECOMMENDATIONS With LP gas,use only the vapor withdrawal system.This type of system uses the vapors formed above the liquid fuel in the storage tank, The engine has been fitted with a fuel carburetion system that meets the specifications of the 1997 California Air Resources Board for tamper-proof dual fuel systems,The unit will run on natural gas or LP gas, but it has been factory set to run on natural gas.Should the primary fuel need to be changed to LP gas,the fuel system needs to be reconfigured.See the Fuel Conversion section for instructions on converting the fuel system. Recommended fuels should have a Btu content of at least 1,000 Btus per cubic foot(37.26 megajoules per cubic meter)for natural gas;or at least 2,500 Btus per cubic foot(93.15 megajoules per cubic meter)for LP gas.Ask the fuel supplier for the Btu content Of the fuel. Required fuel pressure for natural gas is 3.5-7"water column(7-13mm mercury).Required fuel pressure for for liquid propane vapor is 10-12"water column(19-22mm mercury).The primary regulator for the propane supply is NOT INCLUDED with the generator. NOTE; All pipe sizing,construction and layout must comply with NFPA 54 for natural gas applications and NFPA 58 for liquid propane applications.Once the generator is installed,verify that the fuel pressure NEVER drops below it's required fuel pressure rating.For fur- ther information regarding NFPA requirements refer to their website at www.nfpa.org. Prior to installation of the generator,the installer should consult local fuel suppliers or the fire marshal to check codes and regulations for proper installation.Local codes will mandate correct routing of gaseous fuel line piping around gardens,shrubs and other landscaping to prevent any damage, Special considerations should be given when installing the unit where local conditions include flooding,tornados,hurricanes,earthquakes and unstable ground for the flexibility and strength of piping and their connections_ Use an approved pipe sealant or joint compound on all threaded fittings. All installed gaseous fuel piping must be purged and leak tested prior to initial start-up in accordance with local codes,standards and regulations. 16 ZS/8I 3SVd 313 17Id±sf1QNI DC Cd 7..ETPE8E099 t'T:9T ETOZ/0E/60 53 FUEL CONSUMPTION NOTE: Required fuel pressure for natural gas is 3.5.7"water column(7-13mm mercury).The required fuel pressure for LP Vapor is 10-12" water column(19-22mm mercury). These are approximate values,use the appropriate Spec sheet or owner's manual for specific values. Unit I Nat.Gas LP Vapor 1/2 Load Full Load 1/2 Load Full Load 7/8kW 78/2.21 121/3,43 0.87/3.29 1.42/5.37 10/11 kW 124/3.51 195/5.52 1.18/4.45 1.92/7.28 13/13 kW 1 157/4.45 255/7.22 1.64 6.2 - - / 2.95!11.15 14/14 kW 177/5.01 279/7.9 1.35/6.99 3.07/11.E1 15/15 kW 185/5.24 298/8.38 1.83/6.91 2.86%10.82 16/16 kW 193/5.47 312/8.83 1.9/72 3.19,'12.07 16/17 kW 193/5.47 312/8,83 1.99/7.53 3,57/13.53 18/20 kW 205/5.8 308/8.72 2.08/7.87 3.85/1457 "Natural gas is in cubic feet per hour/cubic meters per hour. ""LP is in gallons per hour J liters per hour. Values given are approximate. Verify that gas meter is capable of providing enough fuel flow to include household appliances and all other loads. A DANGER! Gaseous fuels such as natural gas and liquid propane(LP)gas are highly explosive. Even the slightest spark can ignite such fuels and cause an explosion.No leakage of fuel is permitted.Natural gas,which is lighter than air,tends to collect in high areas.LP gas is heavier than air and tends to settle in low areas. NOTE: A minimum of one approved full flow manual shut-off valve must be installed in the gaseous fuel supply line. The valve must be easily accessible.Local codes determine the proper location. NOTE: THE GAS SUPPLY AND PIPE MUST BE SIZED AT 100% LOAD BTU 1 MEGAJOULE RATING. 5.4 FUEL LINE SIZING • First,determine what size pipe is required.Refer to NFPA 54 for NG or NFPA 58 for LP for further information. • Always refer to the owner's manual for the proper BTU I megajoule and required gas pressures.To calculate BTU or Megajoules: -- Natural Gas: BTU=Cubic feet/hour x 1000 Megajoules=Cubic meters i hour x 37.26 — Liquid Propane Vapor: BTU=Cubic feet/hour x 2500 Megajoules=Cubic meters/hour x 93.15 • Start by measuring the distance from the generator to the gas source.The generator should be plumbed directly from the source,not off the end of an existing system. • When measuring the pipe length,add 2.5ft.(.76m)for every angle or bend in the pipe and add that to the overall pipe distance, 17 Z5/6T 3JVd 31:3 1VIJISf1QNI GC OV Z5Th686096 bT :9T E:Tr3Z/LCi60 5.4.1 NATURAL GAS PIPE SIZING To properly use this chart,find the kW rating of the generator in the left column,and trace to the right.The number to the right is the maximum length (measured in feet 1 meters)allowed for the pipe sizes on top.The pipe sizes are measured by inside diameter(ID)to include any fittings,valves (must be full flow),elbows,tees or angles.Add 2.5ft.(,76m)per any bend,tee or angle in the pipe to the overall distance. Pipe Size(in,/mm) kW;. .76! -- 19 1 6 7.2$132 1..5128_ 2151 ,,i.-r;.��c<���.�,.,...,.,:.,.�:...... .,.,.,�u�l�.n"�F�::1' ay�"��::���-�..`=�er�!sy-�y�!�i.��ii"'•F.;u 11 20/6.1 85/25.91 370/112,78 800/243.84 -..--:,•, iw+.coca, _...,!._:�!._,fi, �. �:�...,A..,:-,,, (f� �A r ..{{ ,' "'_'' / tkn�..ph °� aJ �a frntiFri�.��:y::s. __._: ...7�ri_i:�:f^Fi ii?.r:.:�: :k'. � �1' pn �y� } .¢��'��y n:rll+VUP,'art� ..... --.. .�� � .._......pro �. ::-LL:..',':�R � ,=cM.�.lr'�•rrlh/a, - ..16-17 401 17.1 !!o`!CI`"t_^t9fl,x,i�re;i,�. 7.91 4251 29.54 5.4.2 LP VAPOR PIPE SIZING To properly use this chart,find the kW rating of the generator in the left column,and trace to the right.The number to the right is the maximum length (measured in feet/meters)allowed for the pipe sizes on top.The pipe sizes are measured by inside diameter(ID)to include any fittings,valves (must be full flow),elbows,tees or angles.Add 2.5ft,(.76m)per any bend,tee or angle in the pipe to the overall distance. NOTE:Pipe sizes are using a second stage regulator. Pipe Size(in.!mm) kW .75/19 1/25 1.25132 - �m!µn7i , i x;a;cry • -- ..f��._..� - ..-.may--._: ,_.^y...'..._ 11 70/21.33 255/_77,72 1000/30.4,8 m.r, 16-17 25/7.62 130/39.62 5401164.59 5.4.3 GAS INSTALLATION SUMMARY GAS PIPE SIZING IS ONE OF THE MOST CQMMONL Y MADE MISTAKES A eRQPERLY SIZED QAS PIPE IS(Wirt CAL TO THE PROPER OPERATION OF THE GENERATOR. THE GENERATOR INLET SIZE HAS NO BEARING ON THE PROPER GAS PIPE SIZE NOTE: THE GAS SUPPLY AND PIPE MUST BE SIZED AT 100% LOAD BTU I MEGAJOULE RATING. 5.5 INSTALLING& CONNECTING GAS LINES 1. Both natural gas and LP Vapor are highly volatile substances,so strict adherence to all safety procedures,codes,standards and regulations is essential. Gas line connections should be made by a certified plumber familiar with local codes.Always use AGA-approved gas pipe and a quality pipe sealant or joint compound. Verify the capacity of the natural gas meter or the LP tank in regards to providing sufficient fuel for both the generator and other operating appliances. - Fuel Regulator installed per laws or regulator manufacturer's specifications • AGA approved gas pipe • Flexible fuel line -- Do not bend!!! - Do not attach directly to generator - Check all connections for leaks • Sediment trap near generator(if applicable or required by code) • Full flaw rated shut-off near generator per local jurisdiction or code 1$ ZS/DZ 39Vd 313 1dIa1SfQNI DO DV Z6117E8ED98 bT:9T ETDZI0Ef60 2. Most applications will require an external manual full flow shutoff valve on the fuel line. Figure 5.2—Full Flow Shutoff Valve 3. When connecting the gas line to the generator,use the provided section of UL Listed or AGA-approved flexible fuel line in accordance with local regulations.The purpose of the flexible fuel line is to ensure that vibration from the generator does not cause a gas leak at one at the connection points,so it's important that the line be Installed with as few trends as possible.Configure the sediment trap(if applicable or required by code)as illustrated. rk1+ pYa • r h SEDIMENT TRAP a,,s v Figure 5.3—Sediment Trap ayt-F A� # �.;• „ :' • _r '—^:'��'' ??�?G'."; �;?.;,;,'.n ,..:�,- 'Wow.•,� Figure 5.4—Incorrect Routing of Flexible Hose 19 'S;'T: 3Ei"d 3-3 1yIaLsnaNI :ia oo ETbc.gF:��9„ VT:9T E TUZIOC1'60 4. Never bend the flexible fuel line to avoid using an elbow. Bending the flexible line decreases its ability to absorb vibrations and defeats its purpose,as well as constricts the actual fuel flOw.See Figure 5.5. 5. Check for leaks by spraying all connection points with a soap solution made of dishwashing soap and water.You should not see the solution be "blown away"or form"bubbles".Next,check the gas pressure at the regulator in the generator by following these steps. - Close gas supply valve. - Remove the top gas pressure test port from the regulator(see Figure 5.6)and install the gas pressure tester(manometer). - Open the gas supply valve and ensure that the pressure is within the specified values. NOTE: See owner's manual or spec sheet for proper fuel pressure specifications.If the gas pressure is not within specifications,contact the local gas supplier. 4) Close gas valve when completed. • . '•*,:. sPressrJrt ,a . ;, . Top Co .hr ".&. 't- •.,:.. � ....i..,issi•. "i.t; -Fuel Regulator ,.; A.* y,�,:: 0 Gas Pressure _. Manomelet Figure 5.5—Checking Pressure with Manometer BTU and Pressure Decal - Check Distance with Gas Provider 7 A "`"'" i r' f,ii.—_.....__, I` Size Meter for Generator j I 4 i ,i 6 — t.oad Plus ALL ; � Appliances Loads '.417atz..a... "•1 0111ROZ Flex Fuel Line a elattimmirmillo Safety Shut-off with Pressure Port For Underground Installations,Verify NG-BTU=Cubic feet/hour X 1000 Piping System for Code Compliance Megajoules=Cubic meters/hour X 37.26 Size gas pipe with Pipe Sizing Guide or to local codes. Figure 5.6—Typical Natural Gas Vapor Installation 20 Z5/ZZ 30c1 3-13 ivielLSflUNI OG OV ZETtE8E898 tT:9T ETBZ/I3E/69 11=.....1 Primary Regulator Per LP Provider I17V and Pressure Dena; I< Check Distance.th LP Provider Ir\ Sly.rank lsroe n rah Chock diatanoa wiM �,I„�� w provide required STUB 111 K7oguleter Menu(.dur.r �- for Generamr and a�L L-�;\ 4I y SrpnU8o7ep flrinl;dnce ii 1QW suro to crsfrt,jr. Iqr Wolter @vaovadml Imi. �'i �`�inlrrgl r��l�ia Fuel Turk i� me(rll ilM4 Al ifR._. Flax Fuel Lin. Fun Plow Safety Shut-off High Pr. ore pipe �'a'a.rr..n with Preueure Pert ailed px LP Provider Sdcondery-vented Regulator LP-BTU a Cubic feetlnour X zoo Megaiouie6.Cube meters/hour X 83.15 Size gas pipe from secondary regulator with Pipe Sizing Guide or to local codes. Figure 5.7--Typical LP Vapor Installation NOTE: When sizing a secondary regulator for LP or high pressure natural gas applications be sure to note the maximum individual load capabilities which will be lower than total capacity.This could impact generator starting performance if sized too small. NOTE: It is not recommended to reduce the fuel pipe Size exiting the secondary regulator unless necessary to accommodate the Ye or 30” flexible fuel line that is shipped with the generator.This may potentially cause starting or performance issues. After completing GAS REQUIREMENTS l CONNECTIONS/ FUEL CONVERSION, it's time for Step5 SECTION 6 -- ELECTRICAL LECTRICAL CONNECTIONS Section 6 Electrical Connections 61 GENERATOR CONNECTIONS NOTE; Control wiring may be already wired on pre-wired generators.If so,tighten the 5'whip conduit inside of the enclosure.If not,wiring must be in accordance with local jurisdiction and codes. 1. Remove the appropriate Main AC/Control Wiring Knock-out Plug from the back of the generator. 2. Install the conduit and Main AC and Control Wires between the generator and the transfer switch.See Figure 2.6 for knockout locations(verify specific transfer switch wiring/connections per model). NOTE: These wiring connections may be present on pre-wired models. NOTE: This wiring can be run in the same conduit if the appropriate insulation rated wire is used. 3. Seal the conduit at the generator and in compliance with any codes, 4. Strip the insulation from the ends of the wires.Do not remove excessive insulation. 5. To connect the control wires,push down on the spring loaded connection point with a fiat head screwdriver,insert wire and release. NOTE: No wire insulation should be in the connection point,only bare Wire. 21 ZS, E'= 3E-Md 313 1aId1Sf1CNI 011 OV ZETbE8E098 bT:9T ET9Z/BE/60 6.2 CONTROL WIRING Control Wire Recommended Length and Size Maximum Wire Length Recommended Wire Size 1-115 ft (1-35 m) No. 18 AWG 116-185 ft (36-56 m) No. 16 AWG 186-295 ft (57-89 m) No. 14 AWG 296-460 ft (90-140 m) No. 12 AWG CONTROL PANEL CONNECTIONS Terminal Numbering Decal Wire Numbers A YELLOW#1 &#2 N1 &N2.240 VAC-Sensing for Utility Dropout and Pickup B WHITE#3 T1 -Fused 120VAC for Battery Charger (see NOTE) C BLACK#3 0-DC(-)Common Ground Wire RED#4 194-DC (+) 12 VDC for Transfer Controls E WHITE#5 23-Transfer Control Signal Wire SPRING LOADED CONNECTION POINTS A 2.. :-°n T':;.�LARGE NEUTRAL LUG TORQUE SPEC • 2f0TO14AWG120LB-IN(13.56N.M) 13* rzeeace below) # ,j\{. . OPTIONALALARM ...... `.1 -_ RELAY CONTACTS ".- iiii ,,, :N 4.5 AWG 35 LB-IN(3.95 N-M), (Normally Open) ',�f. ve.._ 0, ill $ BAWG 25LBAN(2.62N-M), 7j 10.14AW 10L0-I1,4(1.19N4M) C' • 4.1v, ®`) I -"':: }t LARGE GROUND LUG TORQUE SPEC 2,0 TO 14AWG 120 LE-IN 03.56 Figure 6.1 —Control Wiring(found behind control board) NOTE; 'Wire 23 and 194 must be run through the provided wire shielding provided in the manual hag to separate the low voltage from the high voltage wires(see the Parts Shipped Loose section). NOTE: Must be connected to keep battery charged whether unit is running or not. 6,3 MAIN AC WIRING • • Figure 6.2---Main AC Wiring 77 �;rt 3`'"d 1vId±SfICNI DO OV ZETpE8Ee98 rT :aT ETBZ/eE/he NOTE: Main AC wiring must be in accordance with local jurisdiction and codes. 6, Strip the insulation off the wire ends,Do not remove excessive insulation. 7. Remove the two cap plugs located behind the breaker door and to the right of the Main Breaker. 8. Loosen the lugs of the Main Breaker through the access holes. 9. Insert a power wire(El or E2)through the opening in the back cover and into the bottom lug,Torque to the proper specification. NOTE: There are 3 screws inside the top of the breaker panel (behind the breaker door). Removing these screws will allow the entire breaker box to be carefully pulled out.When reinstalling,be certain that the tabs on the bottom lock into place. 10. Connect the Neutral wire to the Neutral Lug and torque to the required specification.See Figure 6.1. 11 Connect the Ground wire to the Ground Lug and torque to the required specification.See Figure 6.1. NOTE: Torque all wiring lugs,bus bars and connection points to the proper torque specifications.Torque specifications for the Main Line Circuit Breaker(MLCB)can be found on a decal located on the inside of the Main Line Circuit Breaker Door. 6.4 BATTERY REQUIREMENTS Group 26R,12V,525CCA(Minimum CCA) 6.5 BATTERY INSTALLATION Fill the battery with the proper electrolyte fluid if necessary and have the battery fully charged before installing it. Before installing and connecting the battery,complete the following steps: 1. Verify that the generator has been turned OFF. 2. Turn off utility power supply to the transfer switch. 3. Remove the 7.5A fuse from the generator control panel. Battery cables were factory connected at the generator.See Figure 6.3.Connect cables to battery posts as follows: 4. Connect the red battery cable(from starter contactor)to the battery post indicated by a positive,POS or(+). 5. Connect the black battery cable(from frame ground)to the battery post indicated by a negative,NEG or('--). 6. Install the red battery post cover(included). NOTE: Dielectric grease should be used on battery posts to aid in the prevention of corrosion. NOTE: Damage will result if battery connections are made in reverse. BLACK LEAD (FROM FRAME) RED LEAD (FROM STARTER CONTACTOR) REP / .. + j BATTERY BLACK Figure 6.3—Battery Cable Connections NOTE: In areas where temperatures regularly fall below 32° F(0"C),it is recommended that a pad type battery heater be installed to aid in cold climate starting.This is available as a cold weather kit through an authorized service dealer. 23 7S/SZ 3-7' d 3-3 1vId±SFIQNI OG OV ZSTt,E8E998 UT 9T 8T13Z/06/69 Town of Montville Building Department CONSTRUCTION PERMIT APPROVAL Applicant is responsible for obtaining all of the required approvals. No permit will be issued until all the required signatures are obtained. `RC1 �i r OrIV� Property Address t`_A( 1, 010 V._lip Job Description Required Department Permit Issuance Approval Approval Tax Collector t-L�-- No — f.30//3 Signature/date Comments: Planning & Zonings z - 7/70%3 Signature/date Comments: J Fire Marshal 22/ ,�� & Signature/date ) '� Comments: /—�L' '"� El Health Department Required for properties with private septic or well Comments: WPCA, Administrative Required for properties on sewer Signature/date Comments: ❑ WPCA, Operations When Required by WPCA Signature/date Comments: Department of Public Works Required when project includes driveway work or certain drainage requirements Signature/date Comments: n Montville Police Department Required for all permits EXCEPT one and two family residential Signature/date Comments: ❑ State Dept. of Transportation Required for Structures over 100,000 sq.ft.or with more than 200 parking spaces-Official copy of STC Certificate of Operation required-per CGS 14-311 Signature/date Building Department Review Complete Signature/date ReuiseiMay 23,2011