HomeMy WebLinkAboutWoodstove Chimney 2007 Field Inspection Notice
Town of Montville
Building Department
February 5, 2010
Address: 59 Pequot Road
Job Description: Install Metal Chimney for Woodstove
Permit Number(s): M2007-0173 Permit Date: November 2,2007
Not Approved Approval
INSPECTION Date: Deficiencies Special Date
Conditions
ChimneyHeight 11/15/07 DJ • Chimney height is not to code.
g 11/21/07 DJ
Thru wall flue •
connection • 11/15/07 DJ
Final inspection for • • 11/21/07 DJ
certificate of approval
Rea.I)ate: 1/18/06
Page 1 of 1
TOWN OF MONTVILLE
Building Department
310 NORWICH-NEW LONDON TURNPIKE
UNCASVILLE, CT 06382-2599
TEL. (860) 848-3030 X382 FAX. (860) 848-7231
MECHANICAL PERMIT
Permit Number: M2007-0173 Date: 02-Nov-07 Map/Lot: 078/054-00B Owner ID: 5438000
Project Location: 59 PEQUOT ROAD Unit:
Job Description: Installation of Metal Chimney for Wood Stove
Owner Name: Joseph J and Kerry L Dougherty Tenant Name: N/A
Careof:
59 Pequot Rd
Uncasville CT 06382- Telephone: (860)848-9703
Contractor Name: Property Owner Telephone:
DBA: ---__._ _� �_—_------- Lic/Reg Type:
Lic/Reg No: 0
Exp Date:
M.__Constructioraa/ale Permit Fees Construction Information_
Building Value: $0.00 Building Fee: - $0.00 Use Group: IRC _
Plumbing Value: $0.00 Plumbing Fee: $0.00 Code: 2005 State Building Code
Mechanical Value: $1,200.00 Mechanical Fee: $16.00
Electrical Value: $0.00 Electrical Fee: $0.00 Construction Type: IRC
Total Value: $1,200.00 Penalty Fee: $0.00 Permit Code: R5
C of 0 Fee: $0.00 Comments:
Plan Review Fee: $0.00
State Ed Fee: $0.19
Total Fee Paid: $16.19
It shall be the owners repsonsibility to schedule the following inspections a minimum of 2 business days in advance:
Field set of approved construction documents shall be available onsite during all inspections.
BUILDING PERMIT INSPECTIONS PLUMBING,MECHANICAL, ELECTRICAL PERMIT INSPECTIONS
❑ Footing -Prior to pouring concrete ❑ R Plumbing and leak test
❑ Deck Piers
❑ R Electrical
❑ Backfill- Footing drains and waterproofing ❑ Elec Trench-with conduit installed
❑ Concrete Slab- Prior to pouring concrete ❑ Pool Bonding
❑ Anchor Bolts-with sill plate and prior to floor framing ❑ Electrical Service CRS No: _ 0
❑ Framing ❑ R HVAC
❑ Masonry Fireplace Throat or Chimney Thimble ❑ Gas Piping and leak test
❑ Fireblocking_Draftstopping INSPECTION REQUIRED UPON COMPLETION
❑ Insulation d❑ Certificate of Approv-
■ Certific.: . I cupancy
Building Official's Approval:___
Town of Montville
Building Department
310 Norwich-New London Tpke.
Tel. 860-848-3030, Ext 382 Uncasville, CT 06382 Fax. 860-848-7231
RESIDENTIAL PERMIT APPLICATION FORM Permit No.: (fl UO7- OI-1,__
Type of Work Ocpnpancy Type Permit Type
A New Construction ,Single Family D Building
El Addition 0 Two-Family ❑ lumbing
❑Alteration 0 Townhouse Mechanical
0 Accessory Structure Electrical CRS#:
Job Address:- 5 1 'Cl{►i.04- 1/_,01-- �/�.h,C(A.S irl
(Number) j- (Street) (
Unit)i I C► 4 (Unit)
Job Description: .I(1S'I"e�If
V I GA On DA e.,44, I nnncy ,.� LOGO 1S.-inv
Owner: 3sek '. rryJJ 1J0 kev--1
Address: 5' i 1 Vl0+ (2
r
Cit)': k.4✓1 C 0.S 1!1 ( State: CT' Zip Code: f)(0 3 8 Z
Telephone: 1.4-cog 6 1t 8 ' 1,'IOS C° of 60 ) 3‘:3- toll 3
Contractor: Ho M{ Q1,J r -X -
i
DBA:
Address:
City: State: Zip Code:
Telephone: License Type: License No.: Expiration Date:
I hereby certify that the proposed work will conform to the State Building Code and all other codes as adopted by the State of Connecticut and the Town
of Montville and further attest that the proposed work is authorized by the owner in fee and that I am authorized to make application for a
permit for such work as described above.
eQ By checking this box, I will follow the requirements of the 2005 NEC as the alternative compliance per section E3301.2.1 of the Residential Code,
instead of the electrical requirements in chapters 33 'hrough 42 of th Residential Code.
i .
Owner/Agent Signature: . i4 0 c/ Aht Date: 1 01241 1t3-3
Cons 7r'tion Valu
Permit Fees
Building Value: Building Fee:
Plumbing Value: Plumbing Fee:
•
1100-°�
Mechanical Value: Mechanical Fee:
Electrical Value: Electrical Fee:
Total Value: Penalty Fee:
C of 0 Fee:
Plan Review Fee:
State Ed Fee:
Total Fee:
Rcvised August 23,2007
Town of Montville
Building Department
File Receipt
Date: 01-Nov-07 Receipt No: 2960
Received From: Karen Dougherty
Job Address: 59 Peauot Road
Fees Collected State Educational Training Fee
Cash: $0.00 Cash: $0.00
Check: $16.19 Check: $0.19
Check No: 3050
Short/Over: $0.00
Construction Value: $1,200.00 ?'
Demolition Value: $0.00
CI
Received Carmen Roberts ki_uv '
� ���� F/L n'1 - � f;
4
Address: 59 Pequot Road
ITEM QTY $IUNIT TOTAL
Building Plumbing Mechanical Electrical
BUILDING AREA
New Construction SF $ 114.17 $ - 5 _
Basement,Finished SF $ 20.87 $ $ _
Basement,Unfinished SF $ 11.28 $ - $-
Crawl Sapce SF $ 8.46 $ -
Interior Renovations SF $ 31 90 $ - $ $
MANUFACTURED HOMES
Ground Anchors SF $ 5.86 $ $ $
Basement SF $ 11.28 $ - $ - $
Crawl Space SF $ 8.46 $ $ $ _
AMENITIES
Kitchen EA $ -
-
$ $
Full Bathroom EA $ $
Half-Bathroom EA $ - $
GARAGE
Attached SF $ 49.41 $ - $ _
Detached SF $ 63.21 $ - $ _
Under SF $ 9.12 $ - $ _
Carport SF $ 18.08 $ -
MECHANICAL
Warm-Air Y Y/N $ -
Hot Water N Y/N $ -
Electric N YIN _
Air Conditioning N Y/N $ - $
ELECTRICAL SERVICE
Upgrade Amps
$ -
Overhead,new Amps $
Underground,new Amps $
Subpanel EA $ 545.00 $ -
Gen Set EA $ 3,500.00 $ -
SOLID FUEL BURNING APPLIANCES
Prefab Metal Fireplace EA $ 5,907.00 $ -
Masonry wlifireplace EA $ 6,451.50 $ -
Masonry w/2 fireplaces EA $ 10,087.00 $ -
Wood Stove,free standing EA $ 2,447.50 $ -
Wood stove insert EA $ 1,690.70 $ -
DECKS.PORCHES,SUNROOMS
Deck SF $ 39.16 $ -
Porch SF $ 135.80 $ -
Sunroom SF $ 160.82 $ - $
POOLS 8 HOT TUBS
Hot Tub EA $ 7,287.50 $ - $ -
Inground Pool EA $ 19,430.40 $ - $
Above Ground Round EA $ 4,635.88 $ - $ -
Above Ground Oval EA $ 5,472.50 $ - $ -
Pool Heater EA $ 8,167.50 $ -
Inflatable Type Pool EA $ 1,542.42 $ -
SHEDS
w/o electrical SF $ 18.50 $ -
w/electrical SF $ 18.50 $ - $ -
RENOVATIONS
Roofing,Overlay SF $ 338 $ -
Roofing,Strip 8 reroof SF $ 3.76 $ -
Roof Sheathing SF $ 1.19 $ -
Siding SF $ 2.30 $ -
Windows EA $ 423.50 $ -
Skylights EA $ 955.54 $ -
Doors,Exterior EA $ 401.50 $ -
Oil Tank,275 Gallon EA $
Oil Tank,550 Gallon EA $
MISCELLANEOUS CALCULATIONS $ 1,20000
TOTALS $ $
$ 1,200.00 $ -
PERMIT FEE CALCULATIONS
Construction Value Fee
Building $ - $
Plumbing Y $ - $
Mechanical Y $ 1,200.00 $ 16.00
Electrical Y $ - $
Working before Permit Issuance $
Certificate of Occupancy Fee $
Plan Review Fee $
State Education Fee $ 0.19
TOTALS $ 1,200.00 $ 16.19
Figures are based on the 2006 RS Means Residential Cost Data
v�v
j4 .," State of Connecticut
• Workers' Compensation Commission 7A
:w41111r. Please TYPE or PRINT IN INK Ix
Proof of Workers' Compensation Coverage when Applying
for a Building Permit for the Sole Proprietor or Property Owner
who WILL NOT act as General Contractor or Principal Employer
Applicant for Building Permit
Name of Applicant for Building PermitJ ti/ /
/
Property located at 6-9
in the City/Town of ,f l (05 1/(1 U L / O 302
Attest
If you are the owner of the above-named property or the sole proprietor of a business doing work on the site of the construction project at the above-named
property and you WILL NOT act as the general contractor or principal employer,you are not required to have workers'compensation insurance coverage.
CHECK ONE (1) BOX ONLY and complete the following:
❑ I am the OWNER of the above-named property.I WILL NOT act as the general contractor or principal employer.
Signature of OWNER Applicant 1-7_..g./
❑ I am the SOLE PROPRIETOR of a business doing work at the above-named property.I WILL NOT act as the general contractor or principal employer.
Name of Business
Federal Employer ID#(FEIN)
Signature of SOLE PROPRIETOR Applicant
7i ackoven o� wad s-�O rr� i n C arcs. c ?ettoi- 12 a.
Litixectiso ILL cr.
tc.)olAg ,-1- 'Res .
5hs t r u k 5.,, -ro
bt_ITwi
36'`
I t9�
CeAurl-
w'd I \ I8 M 56110 �oa1+ to
wwtl
Cemend--f Icor
N
6"— crekw V
N
N ,
Aeernen+ o rk\ cu„vxm rely ovt + &I 91-44
r I
Cs« ?NY-4s \i
4s so for de.NcY�p{-ioy.
p, o� e4iMskeY
ri.ti ke_
� 1
or-
Si
ec eaAt.t
qrow4�r� G J
•
Town of Montville
Building Department
310 Norwich-New London Tpke.
Tel. 860-848-3030, Ext 382 Uncasville, CT 06382 Fax. 860-848-7231
q CONSTRUCTION PERMIT APPROVAL
Property Address
N`-e&k. >Mvket 1 ns-6k & -1i v' -r- o s-1-tor-c,
\Job Description
The applicant is responsible for obtaining all of the required approvals checked off on this form. No building
permit will be issued until all of the required signatures have been obtained.
Required Department Permit Issuance Approval
Approval
Tax Collector o cu �,, c\ 3c\ c,.
Required for all permits
Comments:
WPCA, AdministrativeCs O\-\0-1
Required for properties on sewer
Comments:
(� WPCA, Operations
When Required by WPCA
Comments: j
Planning &Zoning � � �G/2 rI G7
L. y
Required for all permits
Health Department
Required for properties with septic systems—Not required for Plumbing, Electrical,Mechanical,Roofing,Siding,Windows&Doors
Comments:
❑ Department of Public Works
Required when project includes driveway work or certain drainage requirements
Comments:
❑ State Dept. of Transportation
Required for Structures over 100,000 sq. ft.or with more than 200 parking spaces-Official copy of STC Certificate of Operation required—per
CGS 14-311
Comments: A
AU3L
Fire Marsha � l
Required for all permits )
Comments: (�I�L-� ��( -
&miserAugust 5,2005
FRAMING DETAILS: The SuperVent/SuperPro Decorator Ceiling Support will support
up to 50 feet of chimney sections,all of which must be installed above
Plan your installation carefully. If possible,position the stove so the support. Figures 4&5 show the 2 most common types of Ceiling
that the flue outlet is between joists or rafters. Drop a plumb line to Support Installation. Frame(on all 4 sides)a level square opening to
the center of the flue outlet and mark this center point on the ceiling. the dimensions specified in the Framing Dimension Table 1.
Lay out and frame in all openings ensuring the specified 2"clearance
to combustibles is maintained. Refer to Table 1 and applicable Slide the Trim Ring onto the Decorator Ceiling Support and slide the
Tables for framing dimensions and mark the appropriate cutting lines assembly into the framed opening from below. Ensure that the
around the center point. All openings should be square (all four finishing ring is flush with the underside of the ceiling and the
sides),plumb and in perfect alignment with each other(see figure 2). assembly is level and plumb.Secure the ceiling support in place using
For sloping roofs(cathedral/vaulted ceiling),ensure that the framing at least three(3)8-penny(2-1/2")nails through each of the 4 straps
dimension is measured in the horizontal plane(see figure 3). or through the 12 prepunched holes in the support. You may
;c-y� 2"Min.-1.1 substitute in lieu of nails 12-#8 x 2"wood screws. •
1 1
FIGURE 4 Rain Cap
___N El
(j- Ems=
2'Min. L2"Min. 2'Min. I Storm Collar
Ventilated Flashing
FIGURE 2 FIGURE 3
Typical Joist Typical Roof Roof Joist
Yp� yp' (Framed all a sides)
Framing Joist Framing 1
TABLE 1 Framing Dimensions I Chimney Sections
Chimney *Decorator *Wall All Other Attic Space
Flue Ceiling (Support) Framing -- Attic Insulation Shield
Diameter Support Thimble
Ceiling Joist I-I"--
(Framed all 4 sides) � �
5" 123/8 X 123/8 14 x 14 11 x 11
6" 123/8 x 123/8 14 x 14 12 x 12
Decorator
Stove Pipe Adaptor Ceiling Support
7" 133/8 x 133/8 14 x 14 13 x 13 Single Story Installation
8" 143/8 x 143/8 14 x 14 14 x 14 STOVE PIPE ADAPTOR
Note: *When cutting the inside "finished" surface of your wall The Stove Pipe Adaptor(ASE)is installed by twist-locking it into
or ceiling cut a "round hole" to the framing dimension. the bottom end(female end)of the first Chimney Section that enters
the Ceiling Support. Do not install an elbow in the Ceiling Support.
INSTALLATION PROCEDURES: Make sure that the male coupler of the insulated Chimney Length is
pointing upwards as indicated by the arrow on the chimney label.
DECORATOR CEILING SUPPORT Lower the assembly down into the Decorator Ceiling Support
To complete a proper Decorator Ceiling Support installation, the ensuring that the stovepipe adaptor sleeve is protruding through the
following parts will or may be required: support and into the living space(see Figure 5).
-Decorator Ceiling Support(DCS):Required when supporting a The crimped end(stub)of the Stove Pipe Adaptor is intended to fit
chimney through a flat level ceiling.
-Stove Pipe Adaptor(ASE):Transition from the chimney to flue inside of the flue pipe from a solid fuel appliance, thus preventing
pipe condensate drips at the chimney connection. Install inter-connecting
-Attic Insulation Shield(AIS): Required where a chimney passes FIGURE 5
from a lower living space into an unoccupied attic space.
-Fires top Joist Shield(FJS):Required where a chimney passes from Chimney Length
a lower living space into an upper living space or occupied attic
space.
-Roof Flashing Assembly(including Storm Collar):Required when
the chimney penetrates a roof.
- Rafter Radiation Shield (RRS): Required when the chimney is Stove Pipe Adaptor
(ASE) \ -
enclosed immediately below the roof.
-Suitable lengths of Chimney:The chimney diameter(ID)should be "°°""""'"""
sized to suit the appliance. ��
��"♦ ♦ ♦ ♦
- 15° or 30° Elbow Kit: To avoid cutting of joists and clear other �' =��
obstructions. Kit includes: 2 Elbows, 1 Offset Support and 4 Decorator
IIIIM
Locking Bands. Ceiling Support ,,,
-Rain Cap:Standard or Deluxe model.
5