Loading...
HomeMy WebLinkAboutStonework Re-Pointing 1988 TOWN OF MONTVILLE BUILDING DEPARTMENTS APPLICATION FOR BUILDING PERMIT ermi t No. 762 7 Date L, Estimated Cost A) rJ OO. Fee $� Owner ��//'/� � Address Tele. Contractor .434 /4/(v/a/..7>757‘,/ Address ��� �Y- Csa�.+C'i�%� �.ff��' Te 1 e. Location of Building A e",74 /� Zone No.„/, Additions & Alterations (Including moving, demolition, sign erection) New Building - Type of Construction Size Type of Heat Fireplace No. of Stories No. Rooms Breezeway No. Baths Garage Use I hereby certify that the •roposed construction will conform to the applicable zoning reg- ulations of the Town of Mp► vi le and the Basic Building Code of the State of Connecticut , and that all statemys -A,- .ntained are true and correct. Signed � %tel Approved Date , �l— - Building Inspector / / ,,`_i ,,,,�Aj,�✓ Inspections For: // Footings Framing Rough Wiring Electric Service Rough Heating Fireplaces Other Misc. Final Inspection for C.O. Approved Rejected Signed • S (e.\ Cit SI (c'—::: - .1 1q) ir' i a � •w ctiOU S2rV1C2S 0 0 0 N Z o c August 25, 1988 - 0 41 W jewood Drive, Jewett City, Ct 06351 (203) 376-2952 Building Official Town of Montville Town Hall, Route 32 Montville, CT 06353 RE: D .W. Transport & Leasing, Inc . Seway Job ff 4 5 4 Dear Sir, • At our clients request we have inspected the remains of the old stone mill building at his property on Pequot Road, and are preparing plans for the buildings renovation and rehabilitation. Our plans will be utilizing a wood frame structure inside (bearing on a new monolithic reinforced concrete slab) , and independent of the existing stone structure. No new or additional vertical loading will be placed directly on the stone; instead the stone will be acting strictly as a siding system. Existing wood window and door headers shall be replaced with either solid stone headers of equal size or steel mortared in place. The existing wood header over the left front door shall be retained, and backed up by a new steel header. The structure will be pointed so that there are no loose joints or stone members, and the top shall have stones removed and mortared level . The new roof truss system will be bearing on the new construction and tied to the stone structure at the top for stability. These measures will allow the project to retain the rustic character of the area, and provide a safe and cost effective alternative to demolition and reconstruction. I have retained Ilmar J. Filhaber, P.E . to review the stability of the existing structure, and the proposed details for it' s renovation. We hope that this answers your immediate concerns in allowing the masonry work to proceed while the final plans are being prepared. If you have any further questions please feel free to call. Thank you in advance for your anticipated cooperation. Sin�erely,of / Steven E. MM' I, Ilmar Filhaber, P.E . Seway & Sons Reviewed & Concur CC: GTS`•/ /S File �� Dave Waddington /SVA t-c i2C�vu v et iio Q Doo 3 "> CdnSr� M7 : 4 �r� v0 3c. • r/3,lei