HomeMy WebLinkAboutSFR Plumbing Rough Plumbing Inspection 2(/
t LL
Name )--341 `.--)
Location of Inspection Pm-4-'3 -
Date 1 II /� . 2 3
1 . Plumbing drain material Cast Iron
pv c (--- CU
' `
2. Number of stories --
2A leak test required 5 _
3. Basement ceiling check pipe size- -. clean_
(;) outs a
4 . Double joists under tub 01
5. Cast iron inspection done 'o `--
6. Floor drains Floor clean outs 1"./`-'"
7. Garage drains
First Floor
Floor
8. Sink drain pipe siz a Back vented ! 't1'
Lav drain/pipe siz v t,-tub drain pipe
size / ven �� ine
9. Estimated inches in front of toilet
10. Vents All fixtures back vented
Revent minimum of 6" above highest fixture
served
aterc' TOWN OF MONTVILLE
OFFICE OF OF THE BUILDING INSPECTOR
848-7166
TRADE PERMITS
PLUMBING HEATING ELECTRICAL
PERMIT NO. 1/43 / 5c2. DATE: /i//14/76P
Property of:
Location: 7
4A-C-. •
Contractor:
Addreiss:
TYPE OF LICENSE:
LICENSE NO.
PERMIT APPROVED BY:
uilding Inspector —Al.Q-45
INSP. I Date:
INSP. 2 Date:
Contractor or Authorized Agent
IP149111r1-1
Signature