Loading...
HomeMy WebLinkAboutSFR Plumbing Rough Plumbing Inspection 2(/ t LL Name )--341 `.--) Location of Inspection Pm-4-'3 - Date 1 II /� . 2 3 1 . Plumbing drain material Cast Iron pv c (--- CU ' ` 2. Number of stories -- 2A leak test required 5 _ 3. Basement ceiling check pipe size- -. clean_ (;) outs a 4 . Double joists under tub 01 5. Cast iron inspection done 'o `-- 6. Floor drains Floor clean outs 1"./`-'" 7. Garage drains First Floor Floor 8. Sink drain pipe siz a Back vented ! 't1' Lav drain/pipe siz v t,-tub drain pipe size / ven �� ine 9. Estimated inches in front of toilet 10. Vents All fixtures back vented Revent minimum of 6" above highest fixture served aterc' TOWN OF MONTVILLE OFFICE OF OF THE BUILDING INSPECTOR 848-7166 TRADE PERMITS PLUMBING HEATING ELECTRICAL PERMIT NO. 1/43 / 5c2. DATE: /i//14/76P Property of: Location: 7 4A-C-. • Contractor: Addreiss: TYPE OF LICENSE: LICENSE NO. PERMIT APPROVED BY: uilding Inspector —Al.Q-45 INSP. I Date: INSP. 2 Date: Contractor or Authorized Agent IP149111r1-1 Signature