HomeMy WebLinkAboutStatement of Special Inspections November 2002 ADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-2765•FAX: 203/878-1504
November 18, 2002
092SI02110402
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Monday, 11-18-02 in order to ascertain
that various construction activities conform to contract documents and that required testing
and inspections are being performed.
During this visit, the Contractors were met while various construction activities were being
performed. These included:
Placing exterior insulation and metal sheathing. Missing clips were placed,
X-bracing was placed and tensioned. Work appeared satisfactory pending
thorough inspection by testing lab.
Advanced Engineering Technologies, Inc.
`��\t\11111!Iitt!!//////
Esmat Ali, P.E. ���� F CONAj %
Q MEKii•Fi y
1 cc: Client � ` n
1 cc: Smith Engineering _ __
1 cc: Town of Montville c *
NO.21959 •
rsh �O,�FSSY CE NG��`\�\:
�11111111111\\\\\�
ENGINEERING TECHNOLOGIES
Alk11.
ADVANCED INC.,
200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
November 11, 2002
092S102110302
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Monday, 11-11-02 in order to ascertain
that various construction activities conform to contract documents and that required testing
and inspections are being performed.
During this visit, the steel erector was met while various construction activities were being
performed. These included:
Placing missing side girts and steel clips. Steel erector was reminded to document
bolting, welding, and erection of steel framing through testing lab.
Advanced Engineering Technologies, Inc.
00011Ii111///0
FCONN,.
�i
Esmat Ali, P.E. �,��., (MEKgF•I>
1 cc: Client -
1cc: Smith Engineering * N0.21959 %'
1 cc: Town of Montville
rs h �S/�'"JAL E w1���
Miniill1 1 W. \'
ilkADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
November 5, 2002
092SI02110202
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Tuesday, 11-05-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit noticed, that:
— Bolting and erection of steel columns, beams, side girts and purlins were
almost completed and appeared satisfactory, pending thorough inspection
by testing lab.
Advanced Engineering Technologies, Inc.
Esmat Ali, P.E.
1 cc: Client
1 cc: Smith Engineering
1cc: Town of Montville ���OF1CONNFc�i,����
* MEK,�,,,
Igb gr C�
=city yt,. .. 1 _
* NO.21959 '
�i �/CENSF`�•' k'•
SSS!/ON, ; `�\
!!fI/i1111
ADVANCED ENGINEERING TECHNOLOGIES, INC. T 1
200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
October 28, 2002
092S102100502
) ---, ) _
J.--- -- Q J ur
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Monday, 10-28-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit,the Contractors were met while various construction activities were
being performed. These included:
— Bolting and erection of structural steel framing is in progress. Contractors
were reminded to document bolting and erection of structural steel through
testing lab.
Advanced Engineering Technologies, Inc.
F — �
1 Com_ eiMlWlueiii
Esmat Ali, P.E. 0* CON
,v0O���i
1cc: Client = ,,w�' - ,Ca G
1 cc: Smith Engineering = , : `'7=A •
I1 cc: Town of Montville * N0.21959 % *
-PO ��CEN` ,
Igb //,' � iONAL t-
'/Illo
l/lllilll}l1
T
ADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
October 21, 2002
092Sl02100402
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Monday, 10-21-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit, noticed that:
Placement and compaction of fill material against concrete foundation walls
and for concrete slab on grade still in progress. Field density tests through
testing lab for compaction percentages of minimum of 95% of its maximum
dry density is required.
Advanced Engineering Technologies, Inc.
•
Esmat Ali P.E. ``` ���111tC10N ����i/�i
MEkgF• ,?)i
1 cc: Client Z;�� ••r v�
1 cc: Smith Engineering = •
�'
1 cc: Town of Montville =•* NO.21959 *
;ss /C'ENS��- ��
rsh /''
/ h-
ADVANCED ENGINEERING TECHNOLOGIES, INC
200 ROWE AVENUE •MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
October 2, 2002
092S102100102
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Wednesday, 10-02-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit, William Rheaume was met while various construction activities
were being performed. These included:
— Placing and compacting fill material against concrete foundation walls and
for slab on grade. Owner was reminded that backfilling shall be in lifts not
exceeding 12" in thickness in its loose condition. Each lift shall be
compacted to minimum of 95% of its maximum dry density established via
modified proctor.
Advanced Engineering Technologies, Inc.
' 1:1S cONIve
Esmat 11, P.E. �� -CMEKgC� �. ...., „CV
,' .r. • C,i
1 cc: Client = CO• . ..t., 1 _
1 cc: Smith Engineering s No.21959 ;
1 cc: Town of Montville � %. //cErvsC�'���"
Igb i,iiiipnnttlOv•
T
ADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
September 25, 2002
092S102090502
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Wednesday, 09-25-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit, noticed that:
- Placed concrete for foundation walls and retaining walls appeared
satisfactory.
- Backfilling against concrete foundation walls and for concrete slab on grade
shall be in lifts not exceeding 12" thickness in its loose condition. Each lift
shall be compacted to minimum of 95% of its maximum dry density,
established via modified proctor.
Advanced Engineering Technologies, Inc.
6
C,oN1/FC-'14
Esmat "' P.E. •'• N`E l'.#0
1 cc: Client = co, ,.t,f. *
1 cc: Smith Engineering No.21959 ;
1cc: Town of Montville .0% E /•< '
1111
ADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
September 17, 2002
092S102090302
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building
1295 Route 32
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Tuesday, 09-17-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit,the Contractors were met while various construction activities were
being performed. These included:
- Placing formwork and steel reinforcement for concrete section of footing at
front line of building.
- Foundation walls and retaining wall at rear and sides of building.
— Contractors stated that concrete is scheduled for tomorrow, 09-18-02, and
the owner will schedule testing lab inspection to document concrete and
reinforcing placement.
Advanced Engineering Technologies, Inc.
01111111/0/0
Esmat E. MEKqC'• 1
,• s./0
'Z. /4`.; •.• .• y� �ii r
1 cc: Client - co
1 cc: Smith Engineering * N0.21959 ' *
1 cc: Town of Montville �'a`• /CENSE ,.• �
Igb ����S/ONAI.
///11111111111
T
ADVANCED ENGINEERING TECHNOLOGIES, INC.
200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504
September 10, 2002
092S102090202
William Rheaume
1295 Route 32
Uncasville, CT 06382
RE: Pre-Engineered Building •
1295 Route 32 ) A, df-6,ci 0
Uncasville, CT
SUB: SPECIAL INSPECTION REPORT
Site for the above referenced project was visited on Tuesday, 09-10-02 in order
to ascertain that various construction activities conform to contract documents
and that required testing and inspections are being performed.
During this visit,the Contractors were met while various construction activities were
being performed. These included:
— Finishing newly placed concrete for footings. Four (4) concrete test
cylinders, labeled Materials Testing, Inc., and dated 09-10-02, were
observed on site.
Advanced Engineering Technologies, Inc.
C----------- ----
�
Esmat Ali, .E. of 5.9
1 cc: Client -•'Z ME •�'� 'y
,,S., •'-‘ .� e '•'o
c.
1 cc: Smith Engineering =0%`�� ;r k.• —�.,
1 cc: Town of Montville — �. a a
�
1•• NO.21959
1gb t;. !C•ENS-)• �'�.
ei/4NAL;N
/1111111