HomeMy WebLinkAboutStatement of Special Inspections November 2002 ADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-2765•FAX: 203/878-1504 November 18, 2002 092SI02110402 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Monday, 11-18-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit, the Contractors were met while various construction activities were being performed. These included: Placing exterior insulation and metal sheathing. Missing clips were placed, X-bracing was placed and tensioned. Work appeared satisfactory pending thorough inspection by testing lab. Advanced Engineering Technologies, Inc. `��\t\11111!Iitt!!////// Esmat Ali, P.E. ���� F CONAj % Q MEKii•Fi y 1 cc: Client � ` n 1 cc: Smith Engineering _ __ 1 cc: Town of Montville c * NO.21959 • rsh �O,�FSSY CE NG��`\�\: �11111111111\\\\\� ENGINEERING TECHNOLOGIES Alk11. ADVANCED INC., 200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 November 11, 2002 092S102110302 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Monday, 11-11-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit, the steel erector was met while various construction activities were being performed. These included: Placing missing side girts and steel clips. Steel erector was reminded to document bolting, welding, and erection of steel framing through testing lab. Advanced Engineering Technologies, Inc. 00011Ii111///0 FCONN,. �i Esmat Ali, P.E. �,��., (MEKgF•I> 1 cc: Client - 1cc: Smith Engineering * N0.21959 %' 1 cc: Town of Montville rs h �S/�'"JAL E w1��� Miniill1 1 W. \' ilkADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 November 5, 2002 092SI02110202 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Tuesday, 11-05-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit noticed, that: — Bolting and erection of steel columns, beams, side girts and purlins were almost completed and appeared satisfactory, pending thorough inspection by testing lab. Advanced Engineering Technologies, Inc. Esmat Ali, P.E. 1 cc: Client 1 cc: Smith Engineering 1cc: Town of Montville ���OF1CONNFc�i,���� * MEK,�,,, Igb gr C� =city yt,. .. 1 _ * NO.21959 ' �i �/CENSF`�•' k'• SSS!/ON, ; `�\ !!fI/i1111 ADVANCED ENGINEERING TECHNOLOGIES, INC. T 1 200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 October 28, 2002 092S102100502 ) ---, ) _ J.--- -- Q J ur William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Monday, 10-28-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit,the Contractors were met while various construction activities were being performed. These included: — Bolting and erection of structural steel framing is in progress. Contractors were reminded to document bolting and erection of structural steel through testing lab. Advanced Engineering Technologies, Inc. F — � 1 Com_ eiMlWlueiii Esmat Ali, P.E. 0* CON ,v0O���i 1cc: Client = ,,w�' - ,Ca G 1 cc: Smith Engineering = , : `'7=A • I1 cc: Town of Montville * N0.21959 % * -PO ��CEN` , Igb //,' � iONAL t- '/Illo l/lllilll}l1 T ADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 October 21, 2002 092Sl02100402 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Monday, 10-21-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit, noticed that: Placement and compaction of fill material against concrete foundation walls and for concrete slab on grade still in progress. Field density tests through testing lab for compaction percentages of minimum of 95% of its maximum dry density is required. Advanced Engineering Technologies, Inc. • Esmat Ali P.E. ``` ���111tC10N ����i/�i MEkgF• ,?)i 1 cc: Client Z;�� ••r v� 1 cc: Smith Engineering = • �' 1 cc: Town of Montville =•* NO.21959 * ;ss /C'ENS��- �� rsh /'' / h- ADVANCED ENGINEERING TECHNOLOGIES, INC 200 ROWE AVENUE •MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 October 2, 2002 092S102100102 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Wednesday, 10-02-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit, William Rheaume was met while various construction activities were being performed. These included: — Placing and compacting fill material against concrete foundation walls and for slab on grade. Owner was reminded that backfilling shall be in lifts not exceeding 12" in thickness in its loose condition. Each lift shall be compacted to minimum of 95% of its maximum dry density established via modified proctor. Advanced Engineering Technologies, Inc. ' 1:1S cONIve Esmat 11, P.E. �� -CMEKgC� �. ...., „CV ,' .r. • C,i 1 cc: Client = CO• . ..t., 1 _ 1 cc: Smith Engineering s No.21959 ; 1 cc: Town of Montville � %. //cErvsC�'���" Igb i,iiiipnnttlOv• T ADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 September 25, 2002 092S102090502 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Wednesday, 09-25-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit, noticed that: - Placed concrete for foundation walls and retaining walls appeared satisfactory. - Backfilling against concrete foundation walls and for concrete slab on grade shall be in lifts not exceeding 12" thickness in its loose condition. Each lift shall be compacted to minimum of 95% of its maximum dry density, established via modified proctor. Advanced Engineering Technologies, Inc. 6 C,oN1/FC-'14 Esmat "' P.E. •'• N`E l'.#0 1 cc: Client = co, ,.t,f. * 1 cc: Smith Engineering No.21959 ; 1cc: Town of Montville .0% E /•< ' 1111 ADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE•MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 September 17, 2002 092S102090302 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building 1295 Route 32 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Tuesday, 09-17-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit,the Contractors were met while various construction activities were being performed. These included: - Placing formwork and steel reinforcement for concrete section of footing at front line of building. - Foundation walls and retaining wall at rear and sides of building. — Contractors stated that concrete is scheduled for tomorrow, 09-18-02, and the owner will schedule testing lab inspection to document concrete and reinforcing placement. Advanced Engineering Technologies, Inc. 01111111/0/0 Esmat E. MEKqC'• 1 ,• s./0 'Z. /4`.; •.• .• y� �ii r 1 cc: Client - co 1 cc: Smith Engineering * N0.21959 ' * 1 cc: Town of Montville �'a`• /CENSE ,.• � Igb ����S/ONAI. ///11111111111 T ADVANCED ENGINEERING TECHNOLOGIES, INC. 200 ROWE AVENUE• MILFORD, CT 06460•TEL: 203/878-8211 • FAX: 203/878-1504 September 10, 2002 092S102090202 William Rheaume 1295 Route 32 Uncasville, CT 06382 RE: Pre-Engineered Building • 1295 Route 32 ) A, df-6,ci 0 Uncasville, CT SUB: SPECIAL INSPECTION REPORT Site for the above referenced project was visited on Tuesday, 09-10-02 in order to ascertain that various construction activities conform to contract documents and that required testing and inspections are being performed. During this visit,the Contractors were met while various construction activities were being performed. These included: — Finishing newly placed concrete for footings. Four (4) concrete test cylinders, labeled Materials Testing, Inc., and dated 09-10-02, were observed on site. Advanced Engineering Technologies, Inc. C----------- ---- � Esmat Ali, .E. of 5.9 1 cc: Client -•'Z ME •�'� 'y ,,S., •'-‘ .� e '•'o c. 1 cc: Smith Engineering =0%`�� ;r k.• —�., 1 cc: Town of Montville — �. a a � 1•• NO.21959 1gb t;. !C•ENS-)• �'�. ei/4NAL;N /1111111