HomeMy WebLinkAbout24ft Above Ground Pool and 18x24 Deck Permit/Insp 2011 Town of Montville
Building Department
310 Norwich-New London Tpke.
Tel. 860-848-3030, Ext 382 Uncasville, CT 06382 Fax. 860-848-7231
RESIDENTIAL PERMIT APPLICATION FORM Permit No.:
Type of Work upancy Type Permit T e
❑ New Construction Single Family Building
❑Addition Two-Family lumbing
❑Alteration 0 Townhouse ❑ Mechanical
0 Accessory Structure '❑ Electrical CRS#:
Property Address: a k ?a,c4 i -tic)uo t..!
(Number) (Street) nI1 ff11 (Unit)
Job Description: Iv11O C® o,n i it -Co-r- chk-g-J to cQ &L or .eaa l ) -46.AAcQ
Desk- c 44-r k.v...rcuna.Se_ c tdu.5 e_
Owner: �` Clvt %co w,".
Address: l ?CI-43/4,146e_ Z"kO lib 6.J
City: 0„. 4..Q.a(p. State: CT Zip Code: OCo . 1O Telephone(76a ) 50 - S$- (o
Applicant: Ela-v‘. 2,(a '
DBA: //�� L� "
Address: c L ?�d-n tp uQ LJ
City: 003A. n C.u:LQ State: CT Zip Code: O63 7C) Telephone(%4-d ) S.C3 - S k4 Co
Contractors - Complete the Following:
License Type: License No.: Expiration Date:
I hereby certify that the proposed work will conform to the State Building Code and all other codes as adopted by the State of Connecticut and the Town
of Montville and further attest that the proposed work is authorized by the owner in fee and that I am authorized to make application for a
permit for such work as described above.
By checking this box, I will follow the requirements of the 2005 NEC as the alternative compliance per section E3301.2.1 of the Residential Code,
instead of the electrical requirements in chapters 33 through 42 of the Residential Code.
,('
Owner/Agent Signature: Date:
Construction Value Permit Fees
Building Value: Building Fee:
Plumbing Value: Plumbing Fee:
Mechanical Value: Mechanical Fee:
Electrical Value: Electrical Fee:
Total Value: Penalty Fee:
C of 0 Fee:
Plan Review Fee:
State Ed Fee:
Total Fee:
Revised August 23,2007
Town of Montville
Building Department
Bank Card File Receipt
Date: 03-May-11 Receipt No: 5237
Received From: Ethan Brown
Job Address: 21 Partridge Hollow
Fees Collected State Educational Training Fee
Bank Card $133.69 Bank Card $2.69
Short/Over: $0.00
Construction Value: $10,329.00
Demolition Value: $0.00
Received By Carmen Kneeland OAi r i4A LRAJLJOLACji
1
F
Address:
ITEM QTY to/UNITTOTAL
Building Plumbing Mechanical Electrical
BUILDING AREA
New Construction SF $ 113.03 $ - $ -
-
Basement,Finished SF $ 22.96 $ - $ -
Basement,Unfinished SF $ 12.40 $ - $ -
-
Crawl Sapce SF $ 9.30 $ -
-
Interior Renovations SF $ 35.09 $ - $ - $ -
MANUFACTURED HOMES
Ground Anchors SF $ 6.45 $ - $ - $ .
Basement SF $ 12.41 $ - $ - $ -
-
Crawl Space SF $ 9.31 $ - $ - $ -
AMENITIES
Kitchen EA $ - $ - $ -
Fut Bathroom EA $ - $ -
Half-Bathroom EA $ - $ -
-
GARAGE
Attached SF $ 54.35 $ - $ -
-
Detached SF $ 69.53 $ - $ -
Under SF $ 10.03 $ - $ -
Carport SF $ 19.89 $ -
MECHANICAL
Warm-Air Y/N $ -
Hot Water n Y/N $ .
Electric n Y/N $ -
Air Conditioning n Y/N $ -
ELECTRICAL SERVICE
Upgrade Amps $ -
Overhead,new Amps $ -
Underground,new Amps $ -
Subpanel EA $ 599.50 $ -
-
Gen Set EA $ 3,850.00 $ -
SOLID FUEL BURNING APPLIANCES
Prefab Metal Fireplace EA $ 6.497.70 $ -
Masonryvdlfireplace - EA $ 7,096.65 $ -
Masonry w/2 fireplaces - EA $ 11,095.70 $ -
Wood Stove,free standing EA $ Z692.25 $ -
i,,,:,,,,,,,,,,,,',':':,,,';'''''''
Wood stove insert EA $ 1,859.77 $ -
i-
DECKS,PORCHES,SUNROOMS
Deck 342 SF $ 30.20 $ 10,328.40
Porch SF $ 149.38 $ -
Sunroom SF $ 176.90 $ - $ -
POOLS&HOT TUBS
Hot Tub EA $ 8,016.25 $ - $ -
Inground Pool EA $ 21,373.44 $ - $ - "
Above Ground Round EA $ 5.099.46 $ - $ -
-
Above Ground Oval EA $ 6,019.75 $ - $ -
-
Pool Heater EA $ 8,984.25 $ - is
Inflatable Type Pool EA $ 1,550.00 $ -
f
SHEDS
vdo electrical SF $ 20.35 $ -
-
wdelectrical SF $ 20.35 $ - $
RENOVATIONS
Roofing,Overlay SF $ 3.00 $- -
Roofing.Strip&reroof SF $ 4.00 $ -
Roof Sheathing - SF $ 1.31 $ -
Siding SF $ 5.50 $ - {
Windows - EA $ 500.00 $ -
Skylghts EA $ 1,051.10 $ -
Doors,Exterior EA $ 601.50 $
-
Oil Tank,275 Gallon EA $
Oil Tank,550 Gallon EA $ -
MISCELLANEOUS CALCULATIONS
k
TOTALS $ 10,328.40 $ - $ - $ -
k',
PERMIT FEE CALCULATIONS
Construction Value Fee
Building $ 10,329.00 $ 110.00 tt
Plumbing y $ - $ -
Mechanical y $ - $ -
Electrical y $ - $ -
Working before Permit Issuance $ -
Certificate of Occupancy Fee $ 10.00
Plan Review Fee $ 11.00
State Education Fee $ 2.69
TOTALS $ 10,329.00 $ 133.69
Figures are based on the 2006 RS Means Residential Cost Data
Tiz
.�
.
__
).R`
__ - _ '' _ .
|
.
` /
V� «' °
��
-
A
I
, -
� . \ .._
L�- -�- ______ ------'------ ---___-_�-�~--------�^ '
~
`
� w-
xV)`\;»�`
LI(..u,
'
���
�.
�
F �
»^ `
o/
,
.
I II ',.-.',
1 11
1 I MI NM ___
fk
' xS'i;
i 44
a
1
Town of Montville
Building Department
CONSTRUCTION PERMIT APPROVAL
Applicant is responsible for obtaining all of the required approvals. No permit will be issued until all the required signatures are obtained.
Property Add ss
►o Civ On F'i` )e r iilran +o Of:et-- icunrl C>« l() `Purz rb
Job Description U haiLSe—,
Required Department Permit Issuance Approval
Approval
111 Tax Collector
v _ Signature/date
Comments:
• Planning & Zoning !f� -C< &.i 5.3//1
Signature/date
Comments:
1 r'/
Fire Marshal ►r 53 4
Signature/date
Comments:
Health Department
Hequired for all permits except Plumbing,Electrical,Mechanical, Roofing,Siding,Windows&Doors
Signature/date
Comments:
WPCA, Administrative ��5, —
Required for properties on sewer //
Signature/date
Comments:
❑ WPCA, Operations
When Required by WPCA Signature/date
Comments:
❑ Department of Public Works
Required when project includes driveway work or certain drainage requirements Signature/date
Comments:
❑ State Dept. of Transportation
Required for Structures over 100,000 sq.ft.or with more than 200 parking spaces-Official copy of STC Certificate of Operation required-per
CGS 14-311
Signature/date
Building Department Review Complete
Signature/date
Revise March 19,2010