Loading...
HomeSearchMy WebLinkAboutInspection Reports08-27-2024 PZC NOD The Day08-27-2024 PZC NOD TOM10-23-2024 Letter from Engineer - Phase I10-23-2024 Meeting Sign-in Sheet22SITE10 303Route32 Phase Plan 8-12-2022 REV 1-18-2024 (APPROVED)22SITE10 303Route32 PlanSet 022223 (APPROVED)24 ZP 195 (CZC Modified Site Plan-Phase I)24SITE5 - Applicant Response 6-21-202424SITE5 - Applicant Responses 6-18-202424SITE5 - Application24SITE5 - As-Built 05-31-202424SITE5 - Asst Planner Comments 06-12-202424SITE5 - Building Comments 06-12-202424SITE5 - Building Comments 06-20-202424SITE5 - Building Plans (North Building)24SITE5 - Building Plans (South Building)24SITE5 - CertNOD24SITE5 - Continuance Letter 06-25-202424SITE5 - Elevation Plan24SITE5 - FNAL Staff Report24SITE5 - Narrative24SITE5 - Rev Application24SITE5 - Rev Narrative 06-20-202424SITE5 - Rev Narrative 07-08-202424SITE5 - Site Plan 06-07-202424SITE5 - Site Plan Rev 06-17-202424SITE5 - Site Plan Rev 06-20-202424SITE5 - Site Plan Rev 07-09-202424SITE5 - Site Plan Rev 07-30-202424SITE5 - Site Plan Rev 07-30-2024 rec'd 08-02-202424SITE5 - TE Comments 06-13-202424SITE5 - TE Comments 06-20-202424SITE5 - TE Comments 06-25-202424SITE5 - Truck Turning Plan Rev 06-17-202424SITE5 - UH Comments 06-11-202472324 FINAL 303 Draft Motion82724 FINAL 303 Draft MotionApplicants Response to As-Built Punch List 4-2-2024Approved Modified Site Plan 10.10.24**FINAL**As-Built 10-21-2024As-Built 2-13-2024As-Built 2-13-2024 REV 4-30-2024As-Built 2-13-2024 REV 5-31-2024As-Built 2-13-24 REV 5-30-2024As-Built Punch List 3-8-2024As-Built Responses rec'd 5-2-2024Easement for Location of Lighting FixtureLetter from Ellen RE Response As-Built Punch List 4-2-2024Letter of 6-14-2024Outstanding Items 5-29-2024Response to As-Built Punch List 4-2-24 REV 4-30-24State DOT Permit rec'd 5-2-2024