RFI - LOG
RFI 002 - ADDENDUM SIX QUESTIONS Answered - 191003
RFI 003 - GAS SERVICE with PBBA Answers - 191003
RFI 005 - INCOMING SPRINKLER SERVICE - answered by PBA - 190913
RFI 006 - ROTTED AND FAILED BEAMS - answered by ME - 191023
RFI 007 - Helical Pile work - answered by PBA - 190913
RFI 008 - Grout for Helical Piles- response from ME
RFI 010 - Roofing - anwsered by PBA - 200312
RFI 012 - AB Connector foundation (002) answered by ME and PBA 191016
RFI 013 - G Building window height PBA Answer 191016
RFI 014 - Fire Protection clarificatino on code - answered by PBA 191016
RFI 015 - Building B floor infill answered by ME and PBBA 191018
RFI 016 - Existing stone walls - answered by ME - 191217
RFI 017 Lintel schedule - answered by ME - 191111
RFI 018 - Exterior Door schedule - answered by PBA - 191127
RFI 019 - Bldg L scope of work Answered
RFI 020-Bldg M basement equipment-Azt
RFI 021 - Bldg M interior brick wall Answered
RFI 021r1 - Bldg M interior brick wall - answered by PBA - 191227
RFI 022 Drywall resilient channel & NO Genie clips Answered
RFI 023 - Floor systems Addendum 8 - answered by PBA 191220
RFI 026 - Toilet locations in apartments answered by PBA - 191202
RFI 027 028 - Discussion Followup Response
RFI 029 - Bldg B stairshaft dimensions
RFI 030 - Access hatch for crawl spaces
RFI 030 Access hatch for crawl spaces - AZT
RFI 033 -Electrical - AZT
RFI 034 - Bldg M existing column Answered
RFI 034-Bldg M existing column Answered
RFI 034r1 - Bldg M existing column - answered by PBA - 191227
RFI 035 - Stair 2 - Building B - answered by ME and PBA 200115
RFI 036 - Closet depth require a fixture ANSWERED
RFI 037 -Sprinkler calculation without crawl spaces ANSWERED
RFI 038 - Smoke Detectors - ANSWERED
RFI 039 - Bldg D column and wall - answered by PBA and ME - 200115
RFI 040 Bldg M Kitchen types
RFI 041 - Bldg J Unit J-1 Answered
RFI 043 Bldg A floor leveling
RFI 044 - LIGHT GUAGE STEEL-ME RESPONSE 2020-01-21
RFI 045 - Shaftwal at Stair #2 Answered
RFI 046 - Compiled Drawing Set-Azt
RFI 047 - Unit G-5 clearances - answered
RFI 049 - Bldg F filtration equipment drain - AZT
RFI 049 - Cooling Tower Filtration Drain Flow Control-Azt
RFI 051 - Bldg M Water Room heat - AZT
RFI 052 - Code Required Outlets Answered PBBA
RFI 053 - Bldg JM Bridge Connector - AZT
RFI 054 - Bldg C- Added Exhaust Fan - AZT
RFI 057 - Bldg F raised deck handrail - answered by PBA - 200324
RFI 061 - Sprinkler AB Bldg's - AZT - 200506
RFI 063 - Fire rate SB ceiling - answered by PBA - 200427
RFI 064 - HVAC questions - AZT
RFI DP 101 - EJECTOR PUMP GRAVITY LOADS - answered by Aztech - 190724
RFI DP 102 - SANITARY LINE on PINK ROW (INVERTS-CROSS-SECTION) - answered by PBA - 190913
RFI DP 103 - 2019-07-22 BLDG INSPECTOR's QUERIES - answered by PBA - 190724
RFI DP 104 - UTILITY PLAN UPDATE for 2nd GENERATOR - answered by PBA - 190913
RFI-053-Bldg JM Bridge Connector - AZT
RFI-054-Bldg C- Added Exhaust Fan - AZT
RFI-058-Fire Alarm-Azt
RFI-060-Heat in AB Connector (2) - AZT
RFI-062- Booster fan spec - AZT