Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1973 - Business Signage
1975 - Ramp Enclosure
1977 - 8x50 Ramp Addition
1980 - 10,000 Gal. Tank
1983 - Remodel Office Interior
1983 - Remodel Office Interior Plumbing, Electric & Mechanical
1984 - 40ft x 80ft Pool (Groundwater Recovery System)
1984 - Demo Brick Building
1984 - Misc. Electrical Work
1984 - Parking Lot Expansion Excavation
1986 - Electrical for Construction Trailer
1990 - 10,000 Gal. Oil Tank
1990 - Removal of 3 Gas and Oil Tanks
1990 - Removal of 4 Fuel Tanks
1990 - Sprinkler System Backflow Plumbing
1991 - Temporary Construction Trailer for DOT
1994 - Temporary Trailer for Manufacturing
1994 - Temporary Trailer for Manufacturing C/O
1994 - Temporary Trailer for Manufacturing Electrical
1996 - ADA Remodel of Bathrooms - Plumbing
1996 - ADA Remodel of Bathrooms - Electrical
1996 - ADA Remodel of Bathrooms 1996
1996 - Temporary GAT Field Office Trailer
1996 - Temporary Inspector's Field Office Trailer
1997 - ADA Remodel of Bathrooms C/O
1997 - Letter re: Smoking and Picnic Table Area
1997 - Pavillion on Slab
1997 - Pavillion on Slab C/O
2000 - Business Signage
2001 - Ground Water Recovery and Treatment Building
2002 - Business Signage Zoning Permit
2002 - Inspection Notice - Unsafe Vaults by Dam
2003 - Two 120 LP Tanks and Lines for HVAC Unit
2003 - LP Heating and A/C
2003 - Roofing
2003 - Warehouse Roof
2004 - Business Signage
2004 - Re-Roof
2004 -Warehouse Roof
2006 - 1,200 AMP Underground Service
2006 - Sprinkler System for Building M4
2006 - Sprinkler System Modifications Bldg M4
2006 - Switchgear Mezzanine
2006 - Violation - Electrical Work w/o Permit
2006 - Violation - Fire Protection System w/o Permit
2006 - Violation - Mezzanines w/o Permit
2006 - Violation - Mezzaninies w/o Permit
2006 - Violation - Mezzaninies w/o Permit, 2nd Notice
2006 - Warehouse Mezzanine
2008 - Gas Line Testing and Heating Installation
2012 - Pipe Existing Steam Boiler
2014 - Electrical Transformer and Two Panels
2014 - Replace 5 Ton A/C Unit
2015 - 24,000 BTU A/C Unit Replacement
2015 - 8x20 Temporary Construction Trailer
2015 - Electrical for Weigh Station and Construction Trailer
2015 - Weigh Station Footings for Temporary Use
2016 - Sprinkler Replacement in Bldg 4A