Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1972 - Alterations on first floor & Attic section
1973 - Demolition
1973 - Proposed Sewage disposal system
1973 - Restaurant -McDonald's
1973 - Signs
1974 - C/O for McDonald's Restaurant
1974 - Demolition all debris to be removed
1974 - Electrical permit
1974 - Heating permit
1974 - Plumbing permit
1974 - Water analysis report
1974 - Well permit
1979 - Drive thru window
1979 - Electrical
1979 - Plumbing
1979 - Sewage Disposal System permit
1984 - Electric permit
1984 - Install a Playland
1984 - Letter re: Future sewer line tie-in
1985 - Electrical for Remodel
1985 - Remodel interior, exterior trim
1986 - C/O for Remodel
1989 - Install new hot tar roof
1992 - Electrical for 10 ton rooftop HVAC unit
1992 - Install two lights & remove inground wiring
1992 - Playground equipment - C/O
1992 - Polyethylene Piping & schedule 40 black iron pipe
1992 - Replace 5 ton HVAC with rooftop 10 ton unit
1992 - Replace existing playground equipment
1992 - Start up of gas fired HVAC
1993 - Fire Marshal inspections
1995 - Replace rooftop HVAC units
1997 - Change interior lights with energy efficient lighting
1997 - Parking Lot Lights
1999 - Extend Drive-thru, Add Freezer & Remodel Kitchen
2000 - Inspections
2000 - Install 4 sprinkler heads in storage room
2000 - Install drain pump & move gas line
2001 - Violation - Conduit for roof lights is damaged & needs to be replaced
2001 - Violation - water drips on electric panels
2005 - Addition & Remodel
2005 - Electrical work for Addition & Remodel
2005 - Install 3 Ansul Fire Suppression Systems
2005 - Redo Bathrooms for handicap access
2006 - Violation - Pumbing work without permit
2008 - Plumbing for McCafe installation
2008 - C/O for Addition & Remodel
2008 - Electrical for McCafe installation
2008 - Interior Remodel for Installation of McCafe
2008 - McCafe Installation - Certificate of Approval
2011 - Electrical to replace 6 Roofton A/C Units
2011 - Energy Conservation Lighting Project
2011 - Replace 6 Rooftop A/C Units
2018 - Existing Conditions Statement - Modification of Foundation Design
2018 - Install Low Voltage Data Cables
2018 - Interior and Exterior Alterations
2018 - Wire outside building lights; interior renovations of restaurant space
2019 - Install Cables For Radioing System